Remodeling a basement that is already finished in Urbandale still takes a permit, and alterations fall under the 2018 International Existing Building Code. Water rules matter too: the city now requires sump and footing drains to stay off the sanitary sewer. This page covers what Urbandale expects when an old basement is rebuilt.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

Urbandale through the decades

Urbandale jumped from 5,821 residents in 1960 to 14,434 in 1970, then kept growing to 45,580 by 2020. Figures come from the city and the Census Bureau.

5,821 to 14,434

Residents, 1960 to 1970

180 days

Application life with no permit

78.1%

Owner-occupied rate

48,570

Latest population estimate

2018 IEBC

Code for alterations

Chapter 59

Sump and drain disconnect rule

5.7 sq ft

Egress for a new bedroom

Reinspection fee

If work is not ready

Sources: City of Urbandale population history (1960, 1970); Urbandale Code 150.03 (permit timing); U.S. Census Bureau QuickFacts (2020 Census, 2025 estimate, ACS 2020 to 2024); Urbandale Building Codes.

Redoing a finished basement in Urbandale

Most basement remodels in Urbandale need a permit, since the city exempts only minor repairs and small portable sheds. New bedrooms need egress, trade work needs its own permits, and the 2018 International Existing Building Code governs the alterations.

Remodel or minor repair

Urbandale’s permit rule exempts minor repairs and small, portable storage sheds, and little else. Alterations to an existing home follow the 2018 International Existing Building Code. Treat new walls, new rooms and plumbing changes as permit work, and call Building Services at 515-278-3935 if you are unsure.

New bedrooms need egress

Turning an office or rec room into a bedroom brings in the escape window rule. The opening needs 5.7 square feet of net clear area, at least 20 inches wide and 24 inches high. If the sill sits high, Urbandale allows a landing to meet the 44-inch limit. The city’s Egress Window handout and code amendment give the landing sizes.

What we find behind old walls

In older Central Iowa basements, our crew most often finds mold, missing moisture barriers, poor insulation and old or unsafe wiring once walls are open. We have also redone basements other contractors botched, including concrete spilled into a sump pit and walls that collapsed because they were never fastened.

Sump and footing drains

Urbandale amended Chapter 59 by ordinance on June 17, 2025. It requires footing drains, downspouts, sump pumps and sump pits to be disconnected from the sanitary sewer. The deadline runs from the city’s notice. A remodel exposes that plumbing, which makes it a good moment to check.

Trade work under its own permits

Replacing old wiring, adding a bath or moving ductwork means separate electrical, plumbing or mechanical permits in Urbandale. Licensed trades we coordinate handle that work. A full or three-quarter bath also needs a fan vented outdoors, under the city’s amendment.

Inspections and permit timing

Inspections are booked through the Citizenserve portal. A reinspection fee may be charged if work is not complete at the visit, and correction notices can be posted at the site. An application expires after 180 days with no permit issued, with one extension of up to 180 days on request.

How Busy Builders builds your Urbandale basement remodel

We start with a walk-through and look for the signs we see most: moisture marks, missing vapor barriers and dated wiring. Then we draw the new layout, size any bedroom egress to Urbandale’s landing rule, and file through Citizenserve with the trade permits. We also check whether the sump or footing drain still ties into the sanitary sewer, since Chapter 59 now bars that.

Some customers hire us after a bad experience with another contractor, and one came back for a basement remodel after we built their deck. We are registered with DIAL as C140184.

Remodel sequence

Assess, permit, rebuild right

Interior remodel staircase with dark treads, white risers, and horizontal metal railings

Trusted Basement Remodeling Contractors in Urbandale

Since 2020, Busy Builders has completed 1,285+ projects across Central Iowa. We serve homeowners in Urbandale and the surrounding suburbs. Every project starts with a written plan and ends with a walkthrough that confirms every detail is right.

1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Basement Remodeling in Urbandale

It depends on what the old finish hides. Tear-out, moisture fixes, new wiring, egress for a bedroom and radon work all move the total. We give you a written estimate after a walk-through, and Urbandale’s permit fee follows its valuation schedule.

Almost always. The city requires a permit for nearly all construction and exempts only minor repairs and small, portable sheds. Electrical, plumbing and mechanical work also need their own permits. If you are unsure, call Building Services at 515-278-3935.

Not into the sanitary sewer. Chapter 59, amended in June 2025, requires sump pumps, sump pits, footing drains and downspouts to be disconnected from the sanitary sewer. The deadline comes from the city’s notice. The rule targets the sanitary line, so we confirm the approved discharge route with the city before walls close.

Urbandale adopted the 2018 International Existing Building Code for alterations to existing buildings, along with the 2018 International Residential Code. The residential code carries local amendments in section 150.03. Trade work follows the state codes the city lists, such as the 2023 National Electrical Code.

Yes. A new bedroom needs an escape opening of 5.7 square feet net clear, at least 20 inches wide and 24 inches high. If the sill is high, Urbandale allows a landing to meet the limit, and its Egress Window handout lists the sizes. Plan the window before you frame the room.

Mold, missing moisture barriers, poor insulation and old or unsafe wiring are the most common finds in older Central Iowa basements. We also repair work other contractors botched, like concrete poured into a sump pit. Radon is very common on our Des Moines-area jobs as well.

Posted on Google Google
7 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Our overall experience with Busy Builders LLC and its owner/general contractor, Blake, was disappointing, particularly regarding project management, communication, materials, and follow-through. First, I want to acknowledge that the subcontractors did a great job. Our issues were not with the quality of their work, but with the lack of oversight, planning, and coordination from the general contractor. Blake was largely absent throughout the project, providing very little direction or coordination. Planning was disorganized, materials were not ordered in a timely manner, and communication was consistently lacking. One of our biggest frustrations was the handling of materials and finishes. We had specific selections and expectations for our renovation, but as the project progressed, we found ourselves having to make substitutions and compromises because of scheduling constraints and poor planning. Rather than being informed early enough about potential material availability issues or necessary changes, we were often presented with these situations when there was little time left to explore alternatives. This left us feeling pressured to make decisions based on keeping the project moving rather than choosing what we actually wanted. One particularly frustrating example involved the doors. We were told that because Blake couldn’t find the exact same doors, matching the existing woodwork using a different type of wood would be impossible. I later purchased a custom-made wooden dog gate, stained it myself, and managed to match the existing trim perfectly. This experience contradicted what we had been told about the impossibility of matching the existing woodwork and added to our frustration with how material alternatives were presented to us. We were more than willing to pay additional costs for better materials or appropriate replacements had those options been presented to us with sufficient notice. Instead, we felt our choices were limited by circumstances that could have been avoided with better communication and project management. The finished project looks fine on the surface, but it is not the project we asked for or were promised. Based on our experience, we would not hire Busy Builders LLC or Blake again. P.S. I happily wrote a separate positive review for the electrical contractors. They did excellent work and deserved the recognition. My dissatisfaction with this project is directed at the general contractor and how the renovation was managed, not the tradespeople who did the actual work.
Posted on Google Google
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Could not be more satisfied. Competitive pricing, flexible optionality, and amazing responsiveness. We are elated with the work Blake and his team did to finish our basement!
Posted on Google Google
49 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience, they did a great job on our basement. We had nasty foundation and out of code wiring. Blake got it all taken care of and up to code! This experience was awesome!!
Posted on Google Google
53 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
True craftsmanship thru out. No rush job done right from the start. Easy to work with and answered all questions. They did two decks for our duplex. One was Trex and is beautiful and the rental is all pressure treated lumber. Well done Busy Builders and they back their work 100 percent.
Posted on Google Google
91 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Quality work, fair pricing, followed through on what we discussed without delay, and personable guys to deal with. Will be using them again.
Posted on Google Google
122 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Blake and his guys were top notch all the way. I would highly recommend them. They did a wonderful job on our bathroom and our new luxury vinyl floors. We will definitely use them again in the future.
Posted on Google Google
157 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+4
Beautiful job. Josh and Isaiah paid attention to what we wanted and asked lots of questions. Stairs are wonderful!
Posted on Google Google
173 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have used Busy Builders before, and recently hired them again for a full bathroom remodeling project. They are perfectionists and got the job done timely. We love our new bathroom, and plan on hiring them again to remodel our kitchen in 2027.
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

Basement Remodeling Resources for Urbandale

Nov 13, 2026By Blake Daniels

Basement Remodeling Stairs: Code, Headroom, Open Stairwells

Read More

Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs can stay.Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs can stay.Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs…

Nov 4, 2026By Blake Daniels

Basement Finishing in Newer Waukee and Grimes Homes

Read More

A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs checking before framing.A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs checking before framing.A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs…

Oct 12, 2026By Blake Daniels

Remodeling an Already-Finished Basement: What Is Worth Redoing

Read More

A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.