Basement Remodeling
Johnston, IA
Redoing a finished basement in Johnston is a permit job. The city lists remodels and repairs alongside basement finishes, and new bedrooms, walls or trade work all go through its Building Department. This page covers what Johnston asks for, and what we tend to find behind old basement walls.
- Johnston at a glance
Johnston's growth in four numbers
Johnston more than tripled between 1990 and 2010, from 4,702 to 17,278 residents. The Census Bureau’s 2025 estimate is 25,065. The figures below come from the Census Bureau and the State Data Center of Iowa.
4,702 to 17,278
Residents, 1990 to 2010
25,065
2025 population estimate
$369,100
Median owner-occupied value
7 working days
Minimum permit review to allow
Trade Permit
Separate form for trade work
24 hours
Follow up if no confirmation
71.6%
Iowa homes above radon action level
Valuation
Basis for Johnston permit fees
Sources: State Data Center of Iowa (1990, 2000); U.S. Census Bureau QuickFacts (2010 Census, 2025 estimate, ACS 2020 to 2024); Johnston Permits and Fees.
- Permits and rules
Remodeling a finished basement in Johnston: what the city asks
Yes, in most cases you need a permit. Johnston lists remodels and repairs as permit items, and it says the list is not all-inclusive because every project differs. If your job is borderline, ask the Building Department before demolition starts.
Remodel or repair: both are on the list
Johnston’s permit list names remodels and repairs side by side. The Building Department adds that the list is not meant to be all-inclusive, since every project differs in some way. A quick call to 515-727-7778 before you tear out drywall settles whether yours needs one.
New bedrooms and walls
Turning a rec room into a bedroom changes how the space is used, so the plans need to show it. A new bedroom needs an escape window with at least 5.7 square feet of net clear opening. It must be at least 20 inches wide and 24 inches high, with a sill no higher than 44 inches. New walls go on the Building Permit Application with the required site plan.
What we find behind old basement walls
Once old finishes come off in Central Iowa basements, our crew most often finds mold, missing moisture barriers, poor insulation and old or unsafe wiring. We have also rebuilt basements other contractors botched. One had concrete spilled into the sump pit; others had finished walls that collapsed because they were never fastened.
Wiring, plumbing and ductwork
Old basement wiring is a common find, and replacing it is trade work. Johnston puts plumbing, mechanical and electrical work on a separate Trade Permit Application. Licensed electricians, plumbers and HVAC contractors we coordinate do that work on that permit.
Radon during a remodel
A remodel opens walls, which makes it a practical time to deal with radon. 71.6% of Iowa homes test above the EPA action level of 4 pCi/L. Radon is very common on our Des Moines-area basement jobs, and when a test calls for mitigation, we treat it as part of the work.
Inspections and review time
Johnston asks for at least 7 working days to review a permit application. All work is then subject to inspection and approval by the Building Department or its designee. If your emailed application gets no confirmation within 24 hours, the city asks you to follow up another way.
Sources: Johnston Permits and Fees; Johnston Building Department (permit list, trade permits); Johnston building permit application (inspections, review time).
- Our process
How Busy Builders builds your Johnston basement remodel
We walk the basement with you first and note what we can see: stains, soft drywall, the sump and the electrical panel. Then we prepare the drawings and site plan, file with Johnston, and line up licensed trades for the trade permit. Demolition comes after approval. The written estimate spells out the work, and any bedroom gets its egress window planned in.
Some of our basement customers come to us after a bad experience with another contractor. We are a registered Iowa contractor (DIAL C140184) with more than 1,285 completed projects since 2020.
- Walk-through before any demolition
- Permit, site plan and trade permits filed
- Egress and radon planned into the layout
Permit, open, then rebuild

- Achievement
Trusted Basement Remodeling Contractors in Johnston
Since 2020, Busy Builders has completed 1,285+ projects across Central Iowa. We serve homeowners in Johnston and the surrounding suburbs. Every project starts with a written plan and ends with a walkthrough that confirms every detail is right.









- Frequently Asked Questions
FAQs About Basement Remodeling in Johnston
What does a basement remodel cost in Johnston?
It depends on what is behind the walls. Tearing out old finishes, fixing moisture, replacing wiring and adding a bedroom all change the total. We give a written estimate after a walk-through. Johnston bases its permit fee on the value of the work, using the fee tables in its adopted codes.
Do I need a permit to redo an already finished basement in Johnston?
Usually, yes. Johnston lists remodels and repairs among projects that need a permit, not just new finishes. The city also says its permit list is not all-inclusive. Call the Building Department at 515-727-7778 if you are unsure whether your plans need one.
Can I add a bedroom to my basement in Johnston?
Yes, with a permit and an egress window. The window needs at least 5.7 square feet of net clear opening, at least 20 inches wide and 24 inches high. Its sill can sit no higher than 44 inches. The new layout goes on your Building Permit Application, and the city reviews it before work starts.
Does Johnston need separate permits for basement electrical and plumbing?
Yes. The city uses a Trade Permit Application for plumbing, mechanical and electrical work, separate from the building permit. Iowa licenses electricians, plumbers and HVAC contractors. On our jobs, licensed subcontractors we coordinate handle that work.
How long does Johnston take to approve a basement remodel?
The city says a typical review may last up to, if not more than, 7 working days. Its application form asks for a minimum of 7 working days. Every application needs a site plan, so include it from the start.
Is mold common behind old basement walls?
Yes, in our experience. In older Central Iowa basements, mold is one of the things our crew finds most often once walls come down. Missing moisture barriers, poor insulation and old wiring are the others. The repair belongs in the plan before new framing goes up.
- Newest Blogs
Basement Remodeling Resources for Johnston

Basement Remodeling Stairs: Code, Headroom, Open Stairwells
Read MoreBasement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs can stay.Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs can stay.Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs…

Basement Finishing in Newer Waukee and Grimes Homes
Read MoreA newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs checking before framing.A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs checking before framing.A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs…

Remodeling an Already-Finished Basement: What Is Worth Redoing
Read MoreA badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.