Redoing a finished basement in Johnston is a permit job. The city lists remodels and repairs alongside basement finishes, and new bedrooms, walls or trade work all go through its Building Department. This page covers what Johnston asks for, and what we tend to find behind old basement walls.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

Johnston's growth in four numbers

Johnston more than tripled between 1990 and 2010, from 4,702 to 17,278 residents. The Census Bureau’s 2025 estimate is 25,065. The figures below come from the Census Bureau and the State Data Center of Iowa.

4,702 to 17,278

Residents, 1990 to 2010

25,065

2025 population estimate

$369,100

Median owner-occupied value

7 working days

Minimum permit review to allow

Trade Permit

Separate form for trade work

24 hours

Follow up if no confirmation

71.6%

Iowa homes above radon action level

Valuation

Basis for Johnston permit fees

Sources: State Data Center of Iowa (1990, 2000); U.S. Census Bureau QuickFacts (2010 Census, 2025 estimate, ACS 2020 to 2024); Johnston Permits and Fees.

Remodeling a finished basement in Johnston: what the city asks

Yes, in most cases you need a permit. Johnston lists remodels and repairs as permit items, and it says the list is not all-inclusive because every project differs. If your job is borderline, ask the Building Department before demolition starts.

Remodel or repair: both are on the list

Johnston’s permit list names remodels and repairs side by side. The Building Department adds that the list is not meant to be all-inclusive, since every project differs in some way. A quick call to 515-727-7778 before you tear out drywall settles whether yours needs one.

New bedrooms and walls

Turning a rec room into a bedroom changes how the space is used, so the plans need to show it. A new bedroom needs an escape window with at least 5.7 square feet of net clear opening. It must be at least 20 inches wide and 24 inches high, with a sill no higher than 44 inches. New walls go on the Building Permit Application with the required site plan.

What we find behind old basement walls

Once old finishes come off in Central Iowa basements, our crew most often finds mold, missing moisture barriers, poor insulation and old or unsafe wiring. We have also rebuilt basements other contractors botched. One had concrete spilled into the sump pit; others had finished walls that collapsed because they were never fastened.

Wiring, plumbing and ductwork

Old basement wiring is a common find, and replacing it is trade work. Johnston puts plumbing, mechanical and electrical work on a separate Trade Permit Application. Licensed electricians, plumbers and HVAC contractors we coordinate do that work on that permit.

Radon during a remodel

A remodel opens walls, which makes it a practical time to deal with radon. 71.6% of Iowa homes test above the EPA action level of 4 pCi/L. Radon is very common on our Des Moines-area basement jobs, and when a test calls for mitigation, we treat it as part of the work.

Inspections and review time

Johnston asks for at least 7 working days to review a permit application. All work is then subject to inspection and approval by the Building Department or its designee. If your emailed application gets no confirmation within 24 hours, the city asks you to follow up another way.

Sources: Johnston Permits and Fees; Johnston Building Department (permit list, trade permits); Johnston building permit application (inspections, review time).

How Busy Builders builds your Johnston basement remodel

We walk the basement with you first and note what we can see: stains, soft drywall, the sump and the electrical panel. Then we prepare the drawings and site plan, file with Johnston, and line up licensed trades for the trade permit. Demolition comes after approval. The written estimate spells out the work, and any bedroom gets its egress window planned in.

Some of our basement customers come to us after a bad experience with another contractor. We are a registered Iowa contractor (DIAL C140184) with more than 1,285 completed projects since 2020.

How the remodel runs

Permit, open, then rebuild

Interior remodel staircase with dark treads, white risers, and horizontal metal railings

Trusted Basement Remodeling Contractors in Johnston

Since 2020, Busy Builders has completed 1,285+ projects across Central Iowa. We serve homeowners in Johnston and the surrounding suburbs. Every project starts with a written plan and ends with a walkthrough that confirms every detail is right.

1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Basement Remodeling in Johnston

It depends on what is behind the walls. Tearing out old finishes, fixing moisture, replacing wiring and adding a bedroom all change the total. We give a written estimate after a walk-through. Johnston bases its permit fee on the value of the work, using the fee tables in its adopted codes.

Usually, yes. Johnston lists remodels and repairs among projects that need a permit, not just new finishes. The city also says its permit list is not all-inclusive. Call the Building Department at 515-727-7778 if you are unsure whether your plans need one.

Yes, with a permit and an egress window. The window needs at least 5.7 square feet of net clear opening, at least 20 inches wide and 24 inches high. Its sill can sit no higher than 44 inches. The new layout goes on your Building Permit Application, and the city reviews it before work starts.

Yes. The city uses a Trade Permit Application for plumbing, mechanical and electrical work, separate from the building permit. Iowa licenses electricians, plumbers and HVAC contractors. On our jobs, licensed subcontractors we coordinate handle that work.

The city says a typical review may last up to, if not more than, 7 working days. Its application form asks for a minimum of 7 working days. Every application needs a site plan, so include it from the start.

Yes, in our experience. In older Central Iowa basements, mold is one of the things our crew finds most often once walls come down. Missing moisture barriers, poor insulation and old wiring are the others. The repair belongs in the plan before new framing goes up.

Posted on Google Google
7 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Our overall experience with Busy Builders LLC and its owner/general contractor, Blake, was disappointing, particularly regarding project management, communication, materials, and follow-through. First, I want to acknowledge that the subcontractors did a great job. Our issues were not with the quality of their work, but with the lack of oversight, planning, and coordination from the general contractor. Blake was largely absent throughout the project, providing very little direction or coordination. Planning was disorganized, materials were not ordered in a timely manner, and communication was consistently lacking. One of our biggest frustrations was the handling of materials and finishes. We had specific selections and expectations for our renovation, but as the project progressed, we found ourselves having to make substitutions and compromises because of scheduling constraints and poor planning. Rather than being informed early enough about potential material availability issues or necessary changes, we were often presented with these situations when there was little time left to explore alternatives. This left us feeling pressured to make decisions based on keeping the project moving rather than choosing what we actually wanted. One particularly frustrating example involved the doors. We were told that because Blake couldn’t find the exact same doors, matching the existing woodwork using a different type of wood would be impossible. I later purchased a custom-made wooden dog gate, stained it myself, and managed to match the existing trim perfectly. This experience contradicted what we had been told about the impossibility of matching the existing woodwork and added to our frustration with how material alternatives were presented to us. We were more than willing to pay additional costs for better materials or appropriate replacements had those options been presented to us with sufficient notice. Instead, we felt our choices were limited by circumstances that could have been avoided with better communication and project management. The finished project looks fine on the surface, but it is not the project we asked for or were promised. Based on our experience, we would not hire Busy Builders LLC or Blake again. P.S. I happily wrote a separate positive review for the electrical contractors. They did excellent work and deserved the recognition. My dissatisfaction with this project is directed at the general contractor and how the renovation was managed, not the tradespeople who did the actual work.
Posted on Google Google
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Could not be more satisfied. Competitive pricing, flexible optionality, and amazing responsiveness. We are elated with the work Blake and his team did to finish our basement!
Posted on Google Google
49 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience, they did a great job on our basement. We had nasty foundation and out of code wiring. Blake got it all taken care of and up to code! This experience was awesome!!
Posted on Google Google
53 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
True craftsmanship thru out. No rush job done right from the start. Easy to work with and answered all questions. They did two decks for our duplex. One was Trex and is beautiful and the rental is all pressure treated lumber. Well done Busy Builders and they back their work 100 percent.
Posted on Google Google
91 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Quality work, fair pricing, followed through on what we discussed without delay, and personable guys to deal with. Will be using them again.
Posted on Google Google
122 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Blake and his guys were top notch all the way. I would highly recommend them. They did a wonderful job on our bathroom and our new luxury vinyl floors. We will definitely use them again in the future.
Posted on Google Google
157 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+4
Beautiful job. Josh and Isaiah paid attention to what we wanted and asked lots of questions. Stairs are wonderful!
Posted on Google Google
173 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have used Busy Builders before, and recently hired them again for a full bathroom remodeling project. They are perfectionists and got the job done timely. We love our new bathroom, and plan on hiring them again to remodel our kitchen in 2027.
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

Basement Remodeling Resources for Johnston

Nov 13, 2026By Blake Daniels

Basement Remodeling Stairs: Code, Headroom, Open Stairwells

Read More

Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs can stay.Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs can stay.Basement stairs need 6 feet 8 inches of headroom, 7 3/4-inch risers and a 34 to 38-inch handrail. Here is what opening a closed stairwell takes and when old stairs…

Nov 4, 2026By Blake Daniels

Basement Finishing in Newer Waukee and Grimes Homes

Read More

A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs checking before framing.A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs checking before framing.A newer Waukee or Grimes basement skips most of the worst surprises, but it is not finish-ready by default. Here is what your builder likely left and what still needs…

Oct 12, 2026By Blake Daniels

Remodeling an Already-Finished Basement: What Is Worth Redoing

Read More

A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.A badly finished basement is a different project from a bare one. What is behind the walls, what to keep, and when to strip it to the studs.