Marble-look tile shower with stone-top vanity in a bathroom remodeled by Busy Builders

A hall bath and a primary bath can share the same tile and the same faucet brand and still land $40,000 apart. This guide explains why, using the ranges Busy Builders has actually quoted, and shows where the money goes in each bathroom type in Clive: the shower, the glass, the plumbing that moves and the vanity that gets custom.

TLDR: Busy Builders has quoted hall bathrooms from about $3,000 to $5,000 for a light facelift up to about $60,000 for a large primary bathroom remodel; a typical three-quarter to full remodel without moving much lands around $15,000 to $20,000. The gap comes from four things: a tiled walk-in shower instead of a tub-shower, frameless glass, moving plumbing, and a custom double vanity. A Clive permit is needed whenever plumbing or wiring moves.


Same trades, different square footage, different choices

A hall bath in a Clive two-story is usually 40 to 50 square feet with a tub-shower, a single vanity and one light. A primary bath is 80 to 150 square feet with a walk-in shower, a double vanity, a separate toilet room and often a freestanding tub. Every extra fixture is a plumbing rough-in, and every extra square foot of shower is tile and glass.

Busy Builders has quoted hall bathrooms from about $3,000 to $5,000 for a light facelift up to about $60,000 for a large primary bathroom. A typical three-quarter to full remodel without moving much lands around $15,000 to $20,000. Two full bathroom remodels we completed in 2026 were reviewed by the homeowners, one a repeat customer.

The hall bath: where $3,000 becomes $20,000

Pro Tip 1: Decide what “done” means before the estimate. A facelift keeps the tub and the layout; a full remodel replaces everything to the studs. They are different projects with different prices.

The table below shows three levels of hall bath in Clive.

LevelWhat it includesPlanning rangeTime on site
FaceliftNew vanity, faucet, toilet, lighting, paint, mirror; tub and tile stayAbout $3,000 to $5,0002 to 4 days
Three-quarter remodelAbove plus new tub-shower surround, floor tile, exhaust fanAbout $10,000 to $15,0001 to 2 weeks
Full remodel, same layoutEverything to the studs: tile shower or new tub, tiled floor, vanity, fixtures, lighting, fanAbout $15,000 to $20,0002 to 3 weeks

The facelift is the honest budget option. Nothing moves, so no permit is usually needed and the plumber and electrician are on site for hours, not days.

Pro Tip 2: A tub-to-shower conversion in a hall bath adds tile, a shower pan and often glass. It moves a three-quarter remodel into full-remodel money.

The primary bath: where $20,000 becomes $60,000

Pro Tip 3: The four lines that separate a $20,000 primary bath from a $60,000 one are the shower, the glass, the plumbing moves and the vanity. Everything else is close to hall-bath pricing.

LineTypical hall bathLarge primary bathWhy it grows
ShowerTub-shower surround, about $2,500 to $5,000Tiled walk-in shower with bench and niche, about $8,000 to $18,000Square feet of tile, pan, waterproofing membrane, bench framing
GlassCurtain or sliding door, about $200 to $800Frameless enclosure, about $2,000 to $5,000Custom measured after tile, heavy glass, hardware
VanitySingle 36 inch stock, about $800 to $2,000Custom double 72 inch with stone top, about $4,000 to $9,000Custom cabinet, two sinks, two faucets, stone
PlumbingFixtures in place, about $1,500 to $3,000Second sink, freestanding tub filler, relocated toilet, about $5,000 to $12,000Every new location is a rough-in and a vent
Tile floor40 sq ft, about $1,200 to $2,500120 sq ft plus heated floor, about $4,500 to $9,000Area, heat mat, thermostat circuit
Lighting and electricalOne fixture, one fan, about $600 to $1,200Sconces, recessed cans, fan, heated floor circuit, about $2,500 to $5,000Circuits and fixture count

Planning estimates for Clive and the western suburbs; actual costs vary by scope, materials, site conditions and current pricing. Add those six rows up at the high end and the $60,000 primary bath is not a mystery.

Pro Tip 4: Two of our remodeled showers, a walk-in with a glass enclosure and tiled walls, and a marble-look tile shower with a stone-top vanity, are the kind of primary bath this post is describing. Both show where the money went: tile, glass, stone.

Where plumbing moves change everything

The single biggest swing between the two bathroom types is whether fixtures move. In a hall bath, they almost never do. In a primary bath, the wish list usually moves at least one.

Pro Tip 5: Keep the toilet where it is if you can. Moving a toilet on a second floor means opening the ceiling below, rerouting a 3 inch drain and a vent, and a rough plumbing inspection.

Plumbing changeAdded cost, planningPermit
Second vanity sink on the same wallAbout $800 to $1,800Yes
Freestanding tub with floor-mounted fillerAbout $2,000 to $4,500Yes
Moving the toiletAbout $1,500 to $4,000Yes
Converting tub to walk-in shower, same drain locationAbout $1,000 to $2,500 in plumbingYes
Adding a second shower head or body spraysAbout $600 to $1,500Yes
Fixtures replaced in placeAbout $0 to $500Usually no

The City of Clive requires a building permit when plumbing or electrical moves, and the licensed trades pull their permits under it. Fixture-for-fixture swaps usually do not need one.

Illustrative scenario: A Clive family refreshes a hall bath for two kids: new vanity, faucet, toilet, lighting, paint. The tub and tile stay. Three days, about $4,200. No permit.

Illustrative scenario: A couple in Clive remodels a 1996 primary bath to the studs, keeps every fixture location, and chooses a tiled walk-in shower with a semi-frameless door and a stock double vanity. Two and a half weeks on site, about $27,000.

Illustrative scenario: A Country Club neighborhood primary bath gets a freestanding tub, relocated toilet, custom 84 inch vanity, heated floor and frameless glass. Four weeks on site, about $58,000. The plumbing line alone was about $9,500.

Making the money go to the right place

Pro Tip 6: In a primary bath, put the money in the shower and the vanity. Those are the two things you touch every day and the two things a buyer looks at first.

Pro Tip 7: In a hall bath, put the money in the tub-shower surround and the floor. A good surround and a tiled floor make a $12,000 bath look like a $20,000 one.

Pro Tip 8: Semi-frameless glass gets most of the look of frameless at about half the price. Ask to see both.

Pro Tip 9: Choose WaterSense labeled faucets, showerheads and toilets at selection time. Same lead time, lower water bill, and the labels are easy to find.

Pro Tip 10: Heated floors are the most common add after the first estimate. Decide before, because the mat, the thermostat and the circuit all go in before the tile.

Pro Tip 11: An ENERGY STAR exhaust fan sized for the room is cheap insurance against the mold that a primary bath with a big shower will otherwise grow.

Pro Tip 12: Communication is what customers mention most in our reviews. Ask for a fixture list with model numbers before the estimate, so the number you sign is built on real parts.

The table below sums up the two bathrooms at a glance.

QuestionHall bathPrimary bath
Typical size40 to 50 sq ft80 to 150 sq ft
Quoted range we have seenAbout $3,000 to $20,000About $20,000 to $60,000
Fixtures usually moveNoOften
PermitFacelift no; full remodel yesYes
Time on site2 days to 3 weeks2 to 5 weeks
Biggest cost swingsTub-to-shower conversion, tileShower, glass, plumbing, vanity

Two bathrooms, one set of trades, one honest answer: the money follows the shower, the glass and the pipe.

Frequently Asked Questions

Q1: How much does a bathroom remodel cost in Clive? Busy Builders has quoted from about $3,000 to $5,000 for a hall bath facelift up to about $60,000 for a large primary bath. A typical three-quarter to full remodel without moving fixtures lands around $15,000 to $20,000. These are planning estimates; actual costs vary.

Q2: Why is a primary bath so much more than a hall bath? A tiled walk-in shower, frameless glass, a custom double vanity and plumbing that moves. Each of those lines runs two to four times its hall-bath equivalent, and a primary bath usually has all four.

Q3: Do I need a permit for a bathroom remodel in Clive? Yes when plumbing or wiring moves, a circuit is added, or a wall changes. A fixture-for-fixture facelift usually does not. The licensed plumber and electrician pull their trade permits under the building permit.

Q4: What is the cheapest way to make a hall bath look new? A facelift: vanity, faucet, toilet, lighting, mirror and paint with the tub and tile left in place. Three to four days and about $3,000 to $5,000 at the ranges we have quoted.

Q5: How do I keep a primary bath from reaching $60,000? Keep the fixture locations, choose semi-frameless glass and a stock double vanity, and skip the freestanding tub. That usually lands a full-remodel primary bath in the high $20,000s to $30,000s. Call: 844-435-9800 and we will price both directions.

Key Takeaways

  • Hall bath: $3,000 to $5,000 facelift; $15,000 to $20,000 full remodel at the ranges we have quoted. Fixtures stay put; often no permit for a facelift.
  • Primary bath: $20,000 to $60,000; the shower, glass, plumbing and vanity are the swing.
  • The rule: Money follows moved plumbing and tiled square feet.

Price Your Bathroom Both Ways

Busy Builders is a registered Iowa contractor with 1,285+ completed projects across Central Iowa since 2020. Our bathroom remodeling estimates come as a fixture list with model numbers. If the bath is part of a bigger plan, we price the kitchen remodel at the same time. Free consultation. Written warranty on workmanship (details provided in your contract).

Call: 844-435-9800


Disclaimer: This article is for general information and is not project-specific advice. Cost figures are planning estimates and quoted ranges that vary by scope, materials, site conditions and current pricing. Permit requirements vary by city and jurisdiction; verify current requirements with the City of Clive before starting any project. No specific outcomes are guaranteed. Consult a registered contractor; electrical and plumbing work is performed by licensed subcontractors.

Busy Builders | Full-Service Construction and Remodeling | Serving Central Iowa Since 2020