Home Remodeling
Urbandale, IA
Urbandale requires a building permit for almost all construction, so most remodels go through Building Services. Alterations follow the 2018 International Existing Building Code, and trade work takes separate permits. Here is how a remodel moves through the city, from application to final inspection.
- Urbandale at a glance
Urbandale's housing story
Urbandale had 29,072 residents by 2000, and 78.1 percent of its homes are owner-occupied. The tiles below pair those figures with the permit rules that shape a remodel.
29,072
Residents in 2000
180 days
Application life with no permit
78.1%
Owner-occupied share
$335,500
Median owner-occupied home
Almost all
Work that needs a permit
2018 IEBC
Rules for alterations
65%
Plan review fee, complex jobs
80%
Most a permit refund can be
Sources: Urbandale Code 150.03, IRC amendments (permit timing); City of Urbandale population history (2000); U.S. Census Bureau QuickFacts (ACS 2020 to 2024).
- Permits and rules
Permits for remodeling in Urbandale
Plan on a permit. Urbandale requires one for almost all construction except minor repairs and small portable sheds. Trade work needs its own permits, alterations follow the 2018 International Existing Building Code, and fees come from a council-set valuation table.
What needs a permit
Urbandale’s rule is short: a building permit is required for almost all construction except minor repairs and small, portable storage sheds. Plumbing, mechanical and electrical installations require permits too. If your remodel moves a wall, a drain or a circuit, expect paperwork.
Code for existing homes
Urbandale adopted the 2018 International Existing Building Code, which governs alterations to existing buildings. New work also follows the 2018 International Residential Code as amended in section 150.03. Trade work follows state codes: the 2023 National Electrical Code and the 2024 plumbing and mechanical codes.
Fees and plan review
Permit fees come from a valuation table set by City Council resolution. When unusual features need specialized review, the Building Official can add a plan review fee of 65 percent of the permit fee. Since July 1, 2024, the city grants no fee waivers outside city-owned projects and a few council-approved ones.
Permit timing and refunds
An application with no permit issued within 180 days expires, though one extension of up to 180 days is available on request. Refunds, when the Building Official grants them, are capped at 80 percent of the permit fee paid. Plan the start date before you apply.
Inspections and notices
Inspections are scheduled through Citizenserve. Correction notices posted at the job site count as notice under the city code. A reinspection fee may be charged when work is not complete at the time of an inspection. Book each visit only when the stage is truly done.
Housing Code and rentals
Urbandale uses the 2012 International Property Maintenance Code as its Housing Code, in Chapter 151. It matters if you remodel a rental or add an ADU that will not be owner-occupied. That unit must meet the Housing Code and get a housing inspection certificate.
Sources: Urbandale Permits; Urbandale Building Codes (2018 IEBC, Housing Code, state trade codes); Urbandale Code 150.03, IRC amendments (fees, timing, refunds, inspections); Urbandale Valuations and Fees; Urbandale Code 160.37, ADUs.
- Our process
How Busy Builders builds your Urbandale home remodel
We write the scope with you, check it against Urbandale’s permit rule and the existing building code, and price it in a written estimate. We file detailed plans through Citizenserve and coordinate licensed trades for the electrical, plumbing and mechanical permits. We book each inspection when that stage is ready, since the city can charge for a return visit.
Small remodels get fit into our schedule quickly, and a customer noted our crew cleaned up before leaving. Repeat customers are common in our reviews.
- Scope checked against city rules
- Plans and trade permits filed together
- Inspections booked when each stage is done
Scope, file, build, inspect

- Achievement
Trusted Home Remodeling Contractors in
Urbandale, IA
Since 2020, Busy Builders has completed 1,285+ projects across Central Iowa. We serve homeowners in Urbandale and throughout the Des Moines metro.









- Frequently Asked Questions
FAQs About Home Remodeling
in Urbandale, IA
What does a remodel cost in Urbandale?
Remodels vary too widely for one range. Structural changes, trade work and finishes set the price. Kitchens with us start at about $250 per square foot. Final costs vary by scope, materials, complexity and location within our service area. Urbandale’s permit fee is figured from its valuation table.
Is there any remodel work I can do without a permit in Urbandale?
Minor repairs. Urbandale requires a permit for almost all construction, exempting only minor repairs and small, portable storage sheds. Sheds over 120 square feet or on a permanent foundation need a permit, and even portable sheds need zoning approval.
How long is an Urbandale permit application good for?
180 days. If no permit is issued in that time, the application expires. You can request one extension of up to 180 days. Once a permit is issued, inspections are booked through the Citizenserve portal.
When is Urbandale's permit office open?
Building Services at 3600 86th Street is open Monday to Friday, 8 a.m. to 5 p.m., except holidays. The Building Department line is 515-278-3935. Most permit steps, from applying to tracking review, can be done online through Citizenserve.
Why might Urbandale charge a reinspection fee?
Urbandale’s amended code lets the city charge one when work is not complete at the time of an inspection. Correction notices posted at the job site count as formal notice. Booking only when a stage is truly done avoids the extra charge.
Do I need a separate permit for new wiring in a remodel?
Yes. Urbandale requires permits for electrical, plumbing and mechanical installations, apart from the building permit. Wiring follows the 2023 National Electrical Code adopted by the state. Licensed electricians we coordinate do that work on our remodels.
- Newest Blogs
Home Remodeling Blogs
for Urbandale Homeowners

1950s Ranch Home Remodel in Des Moines: Behind the Walls
Read MoreA 1950s ranch was built before the 1978 lead paint ban and may hide asbestos, aging wiring and empty wall cavities. Here is what to test first, how much insulation to add and which layout changes suit a one-story house.A 1950s ranch was built before the 1978 lead paint ban and may hide asbestos, aging wiring and empty wall cavities. Here is what to test first, how much insulation to add and which layout changes suit a one-story house.A 1950s ranch was built before the 1978 lead paint ban and may hide asbestos, aging wiring and empty wall cavities. Here is what to test first, how much insulation…

How a Remodel Actually Gets Scheduled: The Order of Trades
Read MoreDemo, structure, rough-ins, inspection, drywall, finishes. Why the order cannot change and where homeowners add weeks to their own remodel.Demo, structure, rough-ins, inspection, drywall, finishes. Why the order cannot change and where homeowners add weeks to their own remodel.Demo, structure, rough-ins, inspection, drywall, finishes. Why the order cannot change and where homeowners add weeks to their own remodel.

Fall Remodeling Timeline in Iowa: What to Start Now for 2026
Read MoreFall is the window to plan an Iowa remodel: start interior work now to finish through winter, and design exterior projects to build in spring.Fall is the window to plan an Iowa remodel: start interior work now to finish through winter, and design exterior projects to build in spring.Fall is the window to plan an Iowa remodel: start interior work now to finish through winter, and design exterior projects to build in spring.