Most remodels in Johnston need a permit, and the city says its permit list is not all-inclusive. That makes a quick check with the Building Department worth the call. This page covers what Johnston lists, how its fees work and how long review takes.
- Johnston at a glance
Johnston's story in numbers
Johnston takes its name from Johnston Station, a stop on the old Interurban Railroad. The city incorporated in 1969 and had 24,064 residents by the 2020 Census.
1969
Johnston becomes a city
24,064
2020 Census count
Trade Permit
Separate form for trade work
Site plan
Required on every application
Not all-inclusive
City’s caveat on permit list
7 working days
Minimum review to allow
Valuation
Fee basis for remodels
Demolition
Also needs a Johnston permit
Sources: City of Johnston history (name, incorporation); U.S. Census Bureau QuickFacts (2020 Census); Johnston Permits and Fees.
- Permits and rules
Remodeling in Johnston: which work needs a permit
Johnston requires permits for remodels and repairs, trade work, demolition, and excavation or grading. The city adds that its list is not all-inclusive. If your remodel touches structure, plumbing, wiring or ductwork, plan on a permit.
What Johnston lists
The city’s permit list includes remodels and repairs, plumbing, mechanical and electrical work, and demolition. Fences, accessory buildings, pergolas, pools and hot tubs are on it too. The Building Department notes the list is not all-inclusive, because every project differs in some way.
Structural and load-bearing walls
Taking out a wall that carries weight from above changes the structure, so the plans need to show the new beam and posts. Johnston’s permit for remodels covers that work. Ask the department at 515-727-7778 what drawings it wants for structural changes.
Trade permits
Johnston keeps trade work separate. Plumbing, mechanical and electrical changes go on a Trade Permit Application, apart from the building permit. Iowa licenses those trades, while general contractors like us register with DIAL. On our remodels, licensed subcontractors we coordinate handle them.
Fees and paperwork
Fees follow the value added to the property or the cost of construction, using the fee tables from Johnston’s adopted codes. Every application needs a site plan. You can submit it by drop-off at City Hall, by mail, or by email to BuildingDepartment@cityofjohnston.com.
Review time
The city’s permits page says a typical review may last up to, if not more, 7 working days. Its application form asks for a minimum of 7. If you email the application and hear nothing in 24 hours, follow up by phone or in person.
Demolition and what it uncovers
Johnston lists demolition as a permit item, so ask whether your tear-out falls under it or under the remodel permit. Old finishes can hide problems. In older Central Iowa basements, our crew often finds old or unsafe wiring and poor insulation once walls open.
Sources: Johnston Building Department (permit list, not all-inclusive note); Johnston Permits and Fees (fees, review time); Johnston building permit application.
- Our process
How Busy Builders builds your Johnston home remodel
We walk the house with you, write down the scope, and check it against Johnston’s permit list before we price it. If walls, wiring or plumbing change, we file the building permit with its site plan and line up licensed trades for the trade permit. Work starts after the city’s review, which runs at least 7 working days.
Small remodels get fit into our schedule quickly, and one customer noted the crew cleaned up before leaving. We are a registered Iowa contractor (DIAL C140184) based in West Des Moines.
- Scope checked against the city list
- Building and trade permits coordinated
- Written estimate before work begins
Scope, permits, build

- Achievement
Trusted Home Remodeling Contractors in
Johnston
Since 2020, Busy Builders has completed 1,285+ projects across Central Iowa. We serve homeowners in Johnston and throughout the Des Moines metro.









- Frequently Asked Questions
FAQs About Home Remodeling
in Johnston
What does a home remodel cost in Johnston?
Whole-home and room remodels vary too much for one range. Structural changes, plumbing and wiring moves, and finishes set the total. Kitchens with us start at about $250 per square foot. Final costs vary by scope, materials, complexity and location within our service area. We give a written estimate after a walk-through.
Do I need a permit for a remodel in Johnston?
Usually. The city lists remodels and repairs as permit items and says the list is not all-inclusive. Trade work and demolition are listed separately. Call 515-727-7778 before you open a wall if you are unsure.
Can I apply for a Johnston remodel permit online?
The city’s permits page names no online portal. You can drop the application at City Hall, 6221 Merle Hay Road, or mail it to PO Box 410, Johnston, IA 50131. Email works too, and the city asks you to follow up if no confirmation arrives within 24 hours.
How are remodel permit fees figured in Johnston?
On value. The city sets each fee from the value the work adds or what it costs to build, using the fee tables in its adopted codes. Only a few items, like fences and small uncovered decks, have flat fees.
Does taking out a wall need a permit in Johnston?
Yes, plan on it. Removing a wall that carries weight is structural work, and Johnston lists remodels as permit items. If the wall hides wiring, plumbing or ductwork, moving those needs a trade permit too.
Who reviews and inspects remodels in Johnston?
The Johnston Building Department, led by Building Official Adam Ostert. The application form says all work is subject to inspection and approval by the department or its designee. Reach the department on its main line at 515-727-7778.
- Newest Blogs
Home Remodeling Blogs
for Johnston Homeowners

1950s Ranch Home Remodel in Des Moines: Behind the Walls
Read MoreA 1950s ranch was built before the 1978 lead paint ban and may hide asbestos, aging wiring and empty wall cavities. Here is what to test first, how much insulation to add and which layout changes suit a one-story house.A 1950s ranch was built before the 1978 lead paint ban and may hide asbestos, aging wiring and empty wall cavities. Here is what to test first, how much insulation to add and which layout changes suit a one-story house.A 1950s ranch was built before the 1978 lead paint ban and may hide asbestos, aging wiring and empty wall cavities. Here is what to test first, how much insulation…

How a Remodel Actually Gets Scheduled: The Order of Trades
Read MoreDemo, structure, rough-ins, inspection, drywall, finishes. Why the order cannot change and where homeowners add weeks to their own remodel.Demo, structure, rough-ins, inspection, drywall, finishes. Why the order cannot change and where homeowners add weeks to their own remodel.Demo, structure, rough-ins, inspection, drywall, finishes. Why the order cannot change and where homeowners add weeks to their own remodel.

Fall Remodeling Timeline in Iowa: What to Start Now for 2026
Read MoreFall is the window to plan an Iowa remodel: start interior work now to finish through winter, and design exterior projects to build in spring.Fall is the window to plan an Iowa remodel: start interior work now to finish through winter, and design exterior projects to build in spring.Fall is the window to plan an Iowa remodel: start interior work now to finish through winter, and design exterior projects to build in spring.