Home Building
Urbandale, IA

New homes in Urbandale start at about $150 per square foot with Busy Builders. The city enforces the 2018 residential code with amendments that set its own sprinkler threshold, footing sizes and a surveyed grading check before move-in. Here is what Urbandale requires of a new house.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

Building in a city of 48,570

Urbandale ranked 12th among Iowa cities in 2010 and reached 45,580 people at the 2020 Census. Lots range from 8,750 square feet in R-1S to 13,500 in R-1L.

45,580

2020 Census population

78.1%

Owner-occupied homes

$335,500

Median owner-occupied value

115 mph

Design wind speed

$150 per sq ft

New homes start about here

8,000 sq ft

Sprinkler threshold, garage included

0.2 foot

As-built grading tolerance

8,750 sq ft

Minimum R-1S lot area

Urbandale new home requirements

A new house in Urbandale needs a building permit, detailed plans, and a certified as-built grading plan before occupancy. Homes of 8,000 square feet or more, counting attached garages, need fire sprinklers. The city’s amendments also set footing, foundation drain and anchor bolt minimums.

Submittal and checklist

Urbandale asks for a completed application with detailed plans and specifications. The city publishes a Single Family Dwelling Application Checklist handout listing what to include. Apply through the Citizenserve portal. An application with no permit issued in 180 days expires, with one extension of up to 180 days.

Sprinkler threshold

The city’s amended code requires an automatic residential fire sprinkler system in one- and two-family homes. Homes under 8,000 square feet of floor space, attached garages included, are exempt. In practice, the rule reaches only the largest custom builds, so check your plan’s total floor area early.

Footings, walls and drains

Conventional footings on 2,000 psf soil are 8 by 16 inches with two #4 bars, set 42 inches below grade. Eight-foot foundation walls need at least three horizontal #4 bars. Foundation drains need at least 12 inches of granular fill around the pipe. Anchor bolts are half-inch, spaced no more than six feet apart.

Grading before occupancy

Before Urbandale issues a certificate of occupancy, the city’s sign-off to move in, the applicant’s land surveyor must submit a certified as-built grading plan. Elevations must fall within 0.2 foot of the approved grading plan. Plan the final grade early.

Design loads, energy and radon

Urbandale designs for a 30 psf ground snow load, 115 mph wind, 42-inch frost depth and a -5 F winter design temperature. The energy code is the 2012 IECC, aligned with State of Iowa requirements. Iowa’s HF 2297 took effect July 1, 2026; its passive radon rule for new homes starts once the State Building Code Commissioner adopts it.

Water, sewer and lot rules

Water service comes from the Urbandale Water Utility, a separate utility at (515) 278-3940. Connection fees are not posted on its regulations page, so ask before budgeting. Lots in R-1S need at least 8,750 square feet and 70 feet of width; R-1L needs 13,500 square feet and 90 feet.

How Busy Builders builds your Urbandale new home

We check the lot’s district, size and width, then design within Urbandale’s setbacks and 35-foot height limit. Footings, foundation reinforcement and drains follow the city’s amended tables. Licensed trades we coordinate handle electrical, plumbing and HVAC. Before move-in, the surveyor’s as-built grading plan has to land within 0.2 foot of the approved plan.

We put the cost and the schedule in writing before the build starts. We are a registered Iowa contractor, DIAL C140184.

New build roadmap

Lot to certificate of occupancy

Two-story home addition in house wrap with new windows, built onto an existing home in Ankeny by Busy Builders

Trusted Home Building Contractors in Urbandale, IA

Since 2020, Busy Builders has completed more than 1,285 projects across Central Iowa. That track record reflects projects from the Des Moines metro to suburbs like Urbandale, and it speaks for itself.
1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Home Building in Urbandale

New homes with us start at about $150 per square foot. Final costs vary by scope, materials, complexity and location within our service area. The lot, size, finishes, grading and utility connections drive the total. A house of 8,000 square feet or more also needs fire sprinklers in Urbandale.

Only if it has 8,000 square feet or more of floor space, counting attached garages. Urbandale amended the residential code to require sprinklers in one- and two-family homes, then exempted those under that size. Additions to existing homes are exempt too.

It is a survey of the finished grade around a new home. Before the city issues a certificate of occupancy, the permit applicant’s land surveyor must certify it. Elevations must be within 0.2 foot of the approved grading plan.

It depends on the district. R-1S requires at least 8,750 square feet and 70 feet of width, except corner lots. R-1L requires 13,500 square feet and 90 feet. Both cap height at 35 feet, and both sections were amended in February 2025.

The Urbandale Water Utility, which runs separately from the city’s building office. It is open weekdays from 8:00 a.m. to 4:30 p.m. at (515) 278-3940. Ask the utility about meter and connection costs early, since they are not posted on its regulations page.

It depends on the address. Parts of Urbandale fall in the Urbandale, Waukee, Johnston and West Des Moines school districts, according to those districts. Check the district boundary tools for a lot before you buy.

Posted on Google Google
7 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Our overall experience with Busy Builders LLC and its owner/general contractor, Blake, was disappointing, particularly regarding project management, communication, materials, and follow-through. First, I want to acknowledge that the subcontractors did a great job. Our issues were not with the quality of their work, but with the lack of oversight, planning, and coordination from the general contractor. Blake was largely absent throughout the project, providing very little direction or coordination. Planning was disorganized, materials were not ordered in a timely manner, and communication was consistently lacking. One of our biggest frustrations was the handling of materials and finishes. We had specific selections and expectations for our renovation, but as the project progressed, we found ourselves having to make substitutions and compromises because of scheduling constraints and poor planning. Rather than being informed early enough about potential material availability issues or necessary changes, we were often presented with these situations when there was little time left to explore alternatives. This left us feeling pressured to make decisions based on keeping the project moving rather than choosing what we actually wanted. One particularly frustrating example involved the doors. We were told that because Blake couldn’t find the exact same doors, matching the existing woodwork using a different type of wood would be impossible. I later purchased a custom-made wooden dog gate, stained it myself, and managed to match the existing trim perfectly. This experience contradicted what we had been told about the impossibility of matching the existing woodwork and added to our frustration with how material alternatives were presented to us. We were more than willing to pay additional costs for better materials or appropriate replacements had those options been presented to us with sufficient notice. Instead, we felt our choices were limited by circumstances that could have been avoided with better communication and project management. The finished project looks fine on the surface, but it is not the project we asked for or were promised. Based on our experience, we would not hire Busy Builders LLC or Blake again. P.S. I happily wrote a separate positive review for the electrical contractors. They did excellent work and deserved the recognition. My dissatisfaction with this project is directed at the general contractor and how the renovation was managed, not the tradespeople who did the actual work.
Posted on Google Google
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Could not be more satisfied. Competitive pricing, flexible optionality, and amazing responsiveness. We are elated with the work Blake and his team did to finish our basement!
Posted on Google Google
49 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience, they did a great job on our basement. We had nasty foundation and out of code wiring. Blake got it all taken care of and up to code! This experience was awesome!!
Posted on Google Google
53 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
True craftsmanship thru out. No rush job done right from the start. Easy to work with and answered all questions. They did two decks for our duplex. One was Trex and is beautiful and the rental is all pressure treated lumber. Well done Busy Builders and they back their work 100 percent.
Posted on Google Google
91 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Quality work, fair pricing, followed through on what we discussed without delay, and personable guys to deal with. Will be using them again.
Posted on Google Google
122 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Blake and his guys were top notch all the way. I would highly recommend them. They did a wonderful job on our bathroom and our new luxury vinyl floors. We will definitely use them again in the future.
Posted on Google Google
157 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+4
Beautiful job. Josh and Isaiah paid attention to what we wanted and asked lots of questions. Stairs are wonderful!
Posted on Google Google
173 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have used Busy Builders before, and recently hired them again for a full bathroom remodeling project. They are perfectionists and got the job done timely. We love our new bathroom, and plan on hiring them again to remodel our kitchen in 2027.
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

Home Building Blogs for Urbandale and Central Iowa

Nov 16, 2026By Blake Daniels

Home Building in Waukee: Lots, Fees and Covenants

Read More

A Waukee subdivision lot comes with utility stubs, a recorded plat and covenants that can require plan approval, sod, a tree and a sidewalk. Here is what to read before you buy, and the city's 2026 fees for a new house.A Waukee subdivision lot comes with utility stubs, a recorded plat and covenants that can require plan approval, sod, a tree and a sidewalk. Here is what to read before you buy, and the city's 2026 fees for a new house.A Waukee subdivision lot comes with utility stubs, a recorded plat and covenants that can require plan approval, sod, a tree and a sidewalk. Here is what to read before…

Nov 2, 2026By Blake Daniels

Home Building Through an Iowa Winter: December to March

Read More

A new Central Iowa home can keep moving from December to March once the shell is closed. Here is what pauses, what keeps going under temporary heat, and which metro concrete rules shape the schedule.A new Central Iowa home can keep moving from December to March once the shell is closed. Here is what pauses, what keeps going under temporary heat, and which metro concrete rules shape the schedule.A new Central Iowa home can keep moving from December to March once the shell is closed. Here is what pauses, what keeps going under temporary heat, and which metro…

Oct 7, 2026By Blake Daniels

Building on a Rural Lot in Dallas or Madison County: Septic, Well and County Permits

Read More

County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.