Building a new home in Johnston starts at about $150 per square foot with Busy Builders. The city asks for more paperwork on a new house than on any other permit, including grading and water service applications. Here is what that set includes and what else to plan for.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

A fast-growing Johnston

Johnston grew from 8,649 residents in 2000 to an estimated 25,065 in 2025. Seven of every ten homes are owner-occupied. Census Bureau and State Data Center figures.

25,065

Residents, 2025 estimate

$369,100

Median value, owner-occupied

70.8%

Share of owner-occupied homes

40 sq miles

Johnston school district area

$150 per sq ft

New homes start about here

4 city forms

New-house application set

Water service

Separate city application

July 1, 2026

HF 2297 effective date

New home permits in Johnston, step by step

A new house in Johnston needs a building permit and more. The city links a New Residential Home Application Packet, a New House Building Permit Checklist, a Grading Permit Application and a Water Service Application. Fees follow the value of construction.

The new-home packet

Johnston’s New Residential Home Application Packet is the core of the submittal. The New House Building Permit Checklist lists what the city wants to see with it. Both are linked from the city’s Permits and Fees page. Every permit also needs a site plan with measured property lines.

Grading and water service

A new house goes beyond the building permit. Johnston has a separate Grading Permit Application for site work and a Water Service Application for the connection. Connection or impact fee amounts are not posted on the city’s permit pages, so ask before you set a budget.

Plan review time

The city’s permits page says a typical review may last up to 7 working days, if not more. A new home has the most pieces to check of any permit. Sending the full packet and checklist items together keeps the review in one pass.

Fees based on value

Johnston sets most permit fees from the value added to the property or the cost of construction. It uses the fee tables from the codes it has adopted. Flat fees apply only to a short list of items, such as fences and small uncovered decks.

Radon and the new state law

Iowa’s HF 2297 was signed and took effect July 1, 2026. Its passive radon requirement for new homes starts once the State Building Code Commissioner adopts it. 71.6% of Iowa homes test above the EPA action level of 4 pCi/L.

Lots and the zoning code update

Johnston’s zoning and subdivision code update lists older districts such as R-1(90), R-1(A) and R-1(150) for elimination and rezoning. If you are buying a lot, ask Community Development which district applies today and what the new code will change.

Sources: Johnston Permits and Fees (new home packet, checklist, grading, water service, fees); Johnston building permit application; Johnston Zoning and Subdivision Code Update.

How Busy Builders builds your Johnston new home

We start with the lot: its current zoning district, the grading, and the water service route. Then we assemble the new-home packet, the checklist items, the grading application and the water service application, and file them together. Licensed trades we coordinate handle electrical, plumbing and HVAC.

We put the cost and the timeline in a written estimate and schedule. Busy Builders is registered with DIAL as C140184.

Building with us

Lot check to move-in

Two-story home addition in house wrap with new windows, built onto an existing home in Ankeny by Busy Builders

Trusted Home Building Contractors in Johnston, IA

Since 2020, Busy Builders has completed more than 1,285 projects across Central Iowa. That track record spans projects from the Des Moines metro to communities across Polk County, including Johnston, and it speaks for itself.
1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Home Building in Johnston

New homes with Busy Builders start at about $150 per square foot. Final costs vary by scope, materials, complexity and location within our service area. Size, finishes, the lot, grading and the water service connection all affect the total. We price your plan in a written estimate.

The city links four: a New Residential Home Application Packet, a New House Building Permit Checklist, a Grading Permit Application and a Water Service Application. The building permit also needs a site plan with measured property lines and the footprint of the house.

By value. Johnston figures the fee from the value added to the property or the construction cost, using its code fee tables. The city does not post dollar amounts on its permits page, so ask the Building Department at 515-727-7778 for a figure.

Iowa’s HF 2297 took effect July 1, 2026. Its passive radon requirement for new homes applies once the State Building Code Commissioner adopts it. Radon is common across Iowa, so planning for it during design makes sense either way.

Much of Johnston is served by Johnston Community School District, which spans 40 square miles and about 7,250 K-12 students. Middle and high schools have no attendance boundaries. Elementary assignment comes from the district’s school locator, so check a lot’s address before you buy.

Plan on at least 7 working days of city review after a complete submittal. A new house needs the application packet, checklist, grading and water service forms, and a site plan. We build that review time into the schedule we give you.

Posted on Google Google
7 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Our overall experience with Busy Builders LLC and its owner/general contractor, Blake, was disappointing, particularly regarding project management, communication, materials, and follow-through. First, I want to acknowledge that the subcontractors did a great job. Our issues were not with the quality of their work, but with the lack of oversight, planning, and coordination from the general contractor. Blake was largely absent throughout the project, providing very little direction or coordination. Planning was disorganized, materials were not ordered in a timely manner, and communication was consistently lacking. One of our biggest frustrations was the handling of materials and finishes. We had specific selections and expectations for our renovation, but as the project progressed, we found ourselves having to make substitutions and compromises because of scheduling constraints and poor planning. Rather than being informed early enough about potential material availability issues or necessary changes, we were often presented with these situations when there was little time left to explore alternatives. This left us feeling pressured to make decisions based on keeping the project moving rather than choosing what we actually wanted. One particularly frustrating example involved the doors. We were told that because Blake couldn’t find the exact same doors, matching the existing woodwork using a different type of wood would be impossible. I later purchased a custom-made wooden dog gate, stained it myself, and managed to match the existing trim perfectly. This experience contradicted what we had been told about the impossibility of matching the existing woodwork and added to our frustration with how material alternatives were presented to us. We were more than willing to pay additional costs for better materials or appropriate replacements had those options been presented to us with sufficient notice. Instead, we felt our choices were limited by circumstances that could have been avoided with better communication and project management. The finished project looks fine on the surface, but it is not the project we asked for or were promised. Based on our experience, we would not hire Busy Builders LLC or Blake again. P.S. I happily wrote a separate positive review for the electrical contractors. They did excellent work and deserved the recognition. My dissatisfaction with this project is directed at the general contractor and how the renovation was managed, not the tradespeople who did the actual work.
Posted on Google Google
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Could not be more satisfied. Competitive pricing, flexible optionality, and amazing responsiveness. We are elated with the work Blake and his team did to finish our basement!
Posted on Google Google
49 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience, they did a great job on our basement. We had nasty foundation and out of code wiring. Blake got it all taken care of and up to code! This experience was awesome!!
Posted on Google Google
53 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
True craftsmanship thru out. No rush job done right from the start. Easy to work with and answered all questions. They did two decks for our duplex. One was Trex and is beautiful and the rental is all pressure treated lumber. Well done Busy Builders and they back their work 100 percent.
Posted on Google Google
91 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Quality work, fair pricing, followed through on what we discussed without delay, and personable guys to deal with. Will be using them again.
Posted on Google Google
122 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Blake and his guys were top notch all the way. I would highly recommend them. They did a wonderful job on our bathroom and our new luxury vinyl floors. We will definitely use them again in the future.
Posted on Google Google
157 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+4
Beautiful job. Josh and Isaiah paid attention to what we wanted and asked lots of questions. Stairs are wonderful!
Posted on Google Google
173 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have used Busy Builders before, and recently hired them again for a full bathroom remodeling project. They are perfectionists and got the job done timely. We love our new bathroom, and plan on hiring them again to remodel our kitchen in 2027.
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

Home Building Blogs for Johnston and Central Iowa

Nov 16, 2026By Blake Daniels

Home Building in Waukee: Lots, Fees and Covenants

Read More

A Waukee subdivision lot comes with utility stubs, a recorded plat and covenants that can require plan approval, sod, a tree and a sidewalk. Here is what to read before you buy, and the city's 2026 fees for a new house.A Waukee subdivision lot comes with utility stubs, a recorded plat and covenants that can require plan approval, sod, a tree and a sidewalk. Here is what to read before you buy, and the city's 2026 fees for a new house.A Waukee subdivision lot comes with utility stubs, a recorded plat and covenants that can require plan approval, sod, a tree and a sidewalk. Here is what to read before…

Nov 2, 2026By Blake Daniels

Home Building Through an Iowa Winter: December to March

Read More

A new Central Iowa home can keep moving from December to March once the shell is closed. Here is what pauses, what keeps going under temporary heat, and which metro concrete rules shape the schedule.A new Central Iowa home can keep moving from December to March once the shell is closed. Here is what pauses, what keeps going under temporary heat, and which metro concrete rules shape the schedule.A new Central Iowa home can keep moving from December to March once the shell is closed. Here is what pauses, what keeps going under temporary heat, and which metro…

Oct 7, 2026By Blake Daniels

Building on a Rural Lot in Dallas or Madison County: Septic, Well and County Permits

Read More

County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.