Skip to main content

Home Additions Johnston, IA

Additions in Johnston run about $150 to $750 or more per square foot with us. Each one needs a city permit and a site plan with all four setbacks drawn. Johnston’s zoning code update affects older districts, so the yard rules for your lot deserve a fresh check. Here is what the city asks for.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

Johnston, then and now

Johnston incorporated in the fall of 1969 and counted 2,526 residents by 1980. The 2025 estimate is 25,065. Camp Dodge, a military training site since 1908, covers 4,500 acres in the north of the city.

2,526 to 24,064

Residents, 1980 to 2020

70.8%

Homes owned by occupants

$369,100

Median owner-occupied home

7 working days

Review time the city asks for

$150 to $750+ per sq ft

Additions start about here

4 lot lines

Setbacks shown on application

1,000 sq ft

ADU size cities must allow

R-1(150)

District slated for rezoning

Sources: State Data Center of Iowa (1980); U.S. Census Bureau QuickFacts (2020 Census, 2025 estimate, ACS 2020 to 2024); City of Johnston history; Johnston Permits and Fees.

Adding on in Johnston: setbacks, plans and permits

Every addition in Johnston needs a building permit. The application asks for your proposed setbacks from the front, rear and both side lot lines, shown on a site plan. Because Johnston’s zoning code update affects older districts, confirm your district’s yard rules before design work starts.

Setbacks and the zoning update

Johnston’s application has blanks for proposed setbacks from the front, rear, right side and left side lot lines. The required distances come from your zoning district. The city’s update page lists districts such as R-1(90), R-1(A) and R-1(150) for elimination and rezoning, so older numbers may not hold.

Site plan details

The site plan must show an aerial view, a north arrow, adjacent street names and measured property lines. It also shows the footprint of the addition and every existing structure. The city asks for at least 7 working days to review a complete package.

Footings and frost

An addition’s footings must sit below the frost line. We plan them at least 42 inches below grade. Johnston does not print a frost figure on its permit pages, so we confirm the city’s number with the Building Department when we submit.

Grading and excavation

Johnston treats excavation and grading as permit items of their own. An addition that reshapes the yard may need that permit on top of the building permit. Ask the department at 515-727-7778 whether your dig triggers it before the excavator shows up.

Accessory dwelling units

Iowa law, Senate File 592, lets a homeowner build an ADU up to 1,000 square feet or 50 percent of the house, whichever is larger. Cities cannot require the owner to live on site. Johnston’s zoning rules still apply, so the unit has to fit the lot.

Inspections and trade work

All work on a Johnston addition is subject to inspection and approval by the Building Department or its designee. New wiring, plumbing and ductwork go on the separate Trade Permit Application. Licensed trades we coordinate do that part of the job.

How Busy Builders builds your Johnston home addition

We begin by confirming your lot’s current zoning district with Johnston, since the code update may change older yard numbers. Then we draw the site plan with all four setbacks and file the building permit, plus a grading permit if the dig calls for one. Footings go at least 42 inches deep. Licensed trades we coordinate handle wiring, plumbing and HVAC under the trade permit.

Additions are among the most common jobs in the more than 100 we complete each year. We also build storm shelters, safe rooms and attached garages as part of an addition on request.

Addition roadmap

Zoning check to final walk

Two-story home addition by Busy Builders with exterior finishes matched to the original house

Trusted Home Addition Contractors in Johnston

Since 2020, Busy Builders has completed more than 1,285 projects across Central Iowa.

1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Home Additions in Johnston, IA

Additions run about $150 to $750 or more per square foot with Busy Builders. Final costs vary by scope, materials, complexity and location within our service area. Foundations, a second story, plumbing and how the new space ties into the house all move the number. We price your plan in a written estimate.

That depends on your zoning district. Johnston’s zoning code update affects older districts such as R-1(90), R-1(A) and R-1(150). Ask Community Development for your lot’s current district and yard rules, or call 515-727-7775 about the code update.

Iowa law (Senate File 592) lets an ADU reach 1,000 square feet or 50 percent of the house, whichever is larger. Cities cannot require owner occupancy. Johnston still reviews the unit through its building permit, site plan and zoning rules.

Possibly. Johnston lists excavation and grading as permit items, and new homes file a separate Grading Permit Application. Whether an addition triggers one depends on the dig. Ask the Building Department at 515-727-7778 when you submit.

Yes, on request. We build storm shelters, safe rooms and attached garages as part of addition work, sized to the job. They go through the same Johnston building permit and site plan as the rest of the addition.

Plan for at least 7 working days. The city’s permits page says a typical review may last that long or more. Applications can be dropped off at City Hall, mailed to PO Box 410, or emailed to the Building Department.

Posted on Google Google
7 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Our overall experience with Busy Builders LLC and its owner/general contractor, Blake, was disappointing, particularly regarding project management, communication, materials, and follow-through. First, I want to acknowledge that the subcontractors did a great job. Our issues were not with the quality of their work, but with the lack of oversight, planning, and coordination from the general contractor. Blake was largely absent throughout the project, providing very little direction or coordination. Planning was disorganized, materials were not ordered in a timely manner, and communication was consistently lacking. One of our biggest frustrations was the handling of materials and finishes. We had specific selections and expectations for our renovation, but as the project progressed, we found ourselves having to make substitutions and compromises because of scheduling constraints and poor planning. Rather than being informed early enough about potential material availability issues or necessary changes, we were often presented with these situations when there was little time left to explore alternatives. This left us feeling pressured to make decisions based on keeping the project moving rather than choosing what we actually wanted. One particularly frustrating example involved the doors. We were told that because Blake couldn’t find the exact same doors, matching the existing woodwork using a different type of wood would be impossible. I later purchased a custom-made wooden dog gate, stained it myself, and managed to match the existing trim perfectly. This experience contradicted what we had been told about the impossibility of matching the existing woodwork and added to our frustration with how material alternatives were presented to us. We were more than willing to pay additional costs for better materials or appropriate replacements had those options been presented to us with sufficient notice. Instead, we felt our choices were limited by circumstances that could have been avoided with better communication and project management. The finished project looks fine on the surface, but it is not the project we asked for or were promised. Based on our experience, we would not hire Busy Builders LLC or Blake again. P.S. I happily wrote a separate positive review for the electrical contractors. They did excellent work and deserved the recognition. My dissatisfaction with this project is directed at the general contractor and how the renovation was managed, not the tradespeople who did the actual work.
Posted on Google Google
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Could not be more satisfied. Competitive pricing, flexible optionality, and amazing responsiveness. We are elated with the work Blake and his team did to finish our basement!
Posted on Google Google
49 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience, they did a great job on our basement. We had nasty foundation and out of code wiring. Blake got it all taken care of and up to code! This experience was awesome!!
Posted on Google Google
53 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
True craftsmanship thru out. No rush job done right from the start. Easy to work with and answered all questions. They did two decks for our duplex. One was Trex and is beautiful and the rental is all pressure treated lumber. Well done Busy Builders and they back their work 100 percent.
Posted on Google Google
91 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Quality work, fair pricing, followed through on what we discussed without delay, and personable guys to deal with. Will be using them again.
Posted on Google Google
122 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Blake and his guys were top notch all the way. I would highly recommend them. They did a wonderful job on our bathroom and our new luxury vinyl floors. We will definitely use them again in the future.
Posted on Google Google
157 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+4
Beautiful job. Josh and Isaiah paid attention to what we wanted and asked lots of questions. Stairs are wonderful!
Posted on Google Google
173 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have used Busy Builders before, and recently hired them again for a full bathroom remodeling project. They are perfectionists and got the job done timely. We love our new bathroom, and plan on hiring them again to remodel our kitchen in 2027.
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

Home Addition Resources for Johnston Homeowners

Nov 18, 2026By Blake Daniels

Bump-Out Home Additions in Ankeny: Kitchen and Bath Space

Read More

A bump-out pushes one wall out a few feet to fit an island or a tub. Here is how cantilevered and foundation bump-outs differ, what Ankeny requires and charges, and when a full addition makes more sense.A bump-out pushes one wall out a few feet to fit an island or a tub. Here is how cantilevered and foundation bump-outs differ, what Ankeny requires and charges, and when a full addition makes more sense.A bump-out pushes one wall out a few feet to fit an island or a tub. Here is how cantilevered and foundation bump-outs differ, what Ankeny requires and charges, and…

Nov 9, 2026By Blake Daniels

Tying a Home Addition Into an Older Home in West Des Moines

Read More

A home addition on an older West Des Moines house succeeds or fails at the seam. Here is how footings, floor heights, roof joints, the energy code and alarms come together.A home addition on an older West Des Moines house succeeds or fails at the seam. Here is how footings, floor heights, roof joints, the energy code and alarms come together.A home addition on an older West Des Moines house succeeds or fails at the seam. Here is how footings, floor heights, roof joints, the energy code and alarms come…

Oct 30, 2026By Blake Daniels

Storm Shelter and Safe Room Additions in Central Iowa: Basement, Above-Grade or Both

Read More

A basement is not a safe room. What FEMA P-361 requires, the two ways to build one into a home, and what it costs in a basement finish or an addition.A basement is not a safe room. What FEMA P-361 requires, the two ways to build one into a home, and what it costs in a basement finish or an addition.A basement is not a safe room. What FEMA P-361 requires, the two ways to build one into a home, and what it costs in a basement finish or an…