Skip to main content

Home Additions Clive, IA

In Clive, anything that adds floor area, living area or a roof counts as an addition, from a two-story addition to a covered deck. Each one needs a building permit, and room additions need energy paperwork too. This page covers R-1 setbacks, energy and sprinkler rules, footings and Iowa’s ADU law.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

Clive lots and growth in numbers

Clive had 752 residents in 1960 and 6,064 by 1980, and its oldest lots carry special side-yard rules. Most single-family lots today are zoned R-1. These tiles show the numbers an addition has to fit.

752

Clive residents in 1960

6,064

Clive residents in 1980

7,462

Clive residents in 1990

Polk and Dallas

Counties Clive sits in

35 feet

R-1 front and rear yards

8 feet

R-1 side yard

Jan. 3, 1963

Plat date for narrow-lot relief

8,000 sq ft

Sprinkler line for dwellings

Adding on in Clive: setbacks, plans and permits

Every addition in Clive needs a building permit, and the city defines addition broadly. A room addition needs drawings, a site plan and energy documents. Zoning decides how far you can build toward each lot line. These six cards cover the rules that shape an addition here.

Setbacks on an R-1 lot

Most single-family lots in Clive are zoned R-1. The house must stay 35 feet from the front line and 35 feet from the rear, with 8-foot side yards. R-1 lots need 10,000 square feet and 80 feet of width, and buildings top out at 35 feet. R-2 lots allow a 30-foot front yard.

Narrow lots from 1963 or earlier

Clive gives older lots some room. Some R-1, R-2 and R-3 lots of record were platted on or before January 3, 1963. If one is narrower than today’s minimum, its side yard may be reduced. The reduction follows a schedule in section 11-6-10 of the zoning code. We check your plat date before drawing the addition.

Drawings, site plan and energy forms

A Clive addition packet holds the permit application, a Builder’s Acknowledgement, construction drawings and a site plan where one applies. Room additions also need an energy worksheet or a scope of work from a third-party inspection provider. Covered decks and three- or four-season rooms are exempt from the energy documents.

Footings and frost depth

Addition footings in Clive go at least 42 inches deep, the frost line in the city’s amended design table. The same table sets a 30 psf ground snow load for the new roof. Our crews frame stud walls on the new poured concrete foundation, then sheathe them.

Sprinklers and Iowa's ADU law

Clive requires sprinklers only in dwellings of 8,000 square feet or more, so check the finished size. Iowa’s SF 592 lets an accessory dwelling unit reach 1,000 square feet or 50 percent of the house, whichever is larger. Cities cannot require the owner to live on site.

Inspections and open walls

Clive’s own staff inspect additions, and city code makes whoever completes construction or trade work notify the Construction Services Administrator. An addition opens the house to weather, so note the code’s 10-day rule: stopping work that long without securing the site can end the permit.

How Busy Builders builds your Clive home addition

Every Clive addition starts with the lot: its zoning district, its plat date and the setback lines. We draw the addition, prepare the site plan and energy paperwork, and file the permit. Footings go below the 42-inch frost line, and walls are framed on the new foundation. Licensed trades tie in the electrical, plumbing and HVAC.

We build storm shelters, safe rooms and attached garages as part of an addition when you ask. One finished two-story addition of ours carries an upper deck with metal railings, its exterior finishes matched to the original house.

How we add on

Site plan to finished room

Two-story home addition by Busy Builders with exterior finishes matched to the original house

Trusted Home Addition Contractors in Clive

Since 2020, Busy Builders has completed more than 1,285 projects across Central Iowa.

1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Home Additions in Clive

Additions run about $150 to $750 or more per square foot with Busy Builders. Final costs vary by scope, materials, complexity and location within our service area. A second story, a full foundation or a bathroom inside the addition moves the number up. We give you a written estimate after we see the house and lot.

On an R-1 lot, 35 feet from the front and rear lines and 8 feet from each side. R-2 lots allow a 30-foot front yard with the same rear and side yards. Narrow lots platted on or before January 3, 1963 may qualify for smaller side yards under section 11-6-10.

Yes. Clive treats any project that adds floor area, living area or a roof as an addition. Covered decks, enclosed patios and three- and four-season rooms all go through the addition permit. They do skip the energy worksheet that room additions need.

Under Iowa’s SF 592, an accessory dwelling unit can be up to 1,000 square feet or 50 percent of the main house, whichever is larger. Cities cannot require the owner to live on the property. We check Clive’s zoning for where the unit can sit on your lot before we draw it.

For a room addition, yes. Clive asks for a completed energy worksheet or a scope of work from a third-party inspection provider. Covered decks and three- or four-season rooms are exempt. The energy code edition is the one the State Building Code Bureau has adopted.

Clive’s Community Development Department, with its own staff. City code says whoever completes construction, electrical, plumbing or mechanical work must notify the Construction Services Administrator. Call Community Development at (515) 223-6221 with questions about an addition permit.

Posted on Google Google
7 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Our overall experience with Busy Builders LLC and its owner/general contractor, Blake, was disappointing, particularly regarding project management, communication, materials, and follow-through. First, I want to acknowledge that the subcontractors did a great job. Our issues were not with the quality of their work, but with the lack of oversight, planning, and coordination from the general contractor. Blake was largely absent throughout the project, providing very little direction or coordination. Planning was disorganized, materials were not ordered in a timely manner, and communication was consistently lacking. One of our biggest frustrations was the handling of materials and finishes. We had specific selections and expectations for our renovation, but as the project progressed, we found ourselves having to make substitutions and compromises because of scheduling constraints and poor planning. Rather than being informed early enough about potential material availability issues or necessary changes, we were often presented with these situations when there was little time left to explore alternatives. This left us feeling pressured to make decisions based on keeping the project moving rather than choosing what we actually wanted. One particularly frustrating example involved the doors. We were told that because Blake couldn’t find the exact same doors, matching the existing woodwork using a different type of wood would be impossible. I later purchased a custom-made wooden dog gate, stained it myself, and managed to match the existing trim perfectly. This experience contradicted what we had been told about the impossibility of matching the existing woodwork and added to our frustration with how material alternatives were presented to us. We were more than willing to pay additional costs for better materials or appropriate replacements had those options been presented to us with sufficient notice. Instead, we felt our choices were limited by circumstances that could have been avoided with better communication and project management. The finished project looks fine on the surface, but it is not the project we asked for or were promised. Based on our experience, we would not hire Busy Builders LLC or Blake again. P.S. I happily wrote a separate positive review for the electrical contractors. They did excellent work and deserved the recognition. My dissatisfaction with this project is directed at the general contractor and how the renovation was managed, not the tradespeople who did the actual work.
Posted on Google Google
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Could not be more satisfied. Competitive pricing, flexible optionality, and amazing responsiveness. We are elated with the work Blake and his team did to finish our basement!
Posted on Google Google
49 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience, they did a great job on our basement. We had nasty foundation and out of code wiring. Blake got it all taken care of and up to code! This experience was awesome!!
Posted on Google Google
53 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
True craftsmanship thru out. No rush job done right from the start. Easy to work with and answered all questions. They did two decks for our duplex. One was Trex and is beautiful and the rental is all pressure treated lumber. Well done Busy Builders and they back their work 100 percent.
Posted on Google Google
91 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Quality work, fair pricing, followed through on what we discussed without delay, and personable guys to deal with. Will be using them again.
Posted on Google Google
122 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Blake and his guys were top notch all the way. I would highly recommend them. They did a wonderful job on our bathroom and our new luxury vinyl floors. We will definitely use them again in the future.
Posted on Google Google
157 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+4
Beautiful job. Josh and Isaiah paid attention to what we wanted and asked lots of questions. Stairs are wonderful!
Posted on Google Google
173 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have used Busy Builders before, and recently hired them again for a full bathroom remodeling project. They are perfectionists and got the job done timely. We love our new bathroom, and plan on hiring them again to remodel our kitchen in 2027.
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

Home Addition Blogs for Clive Homeowners

Nov 18, 2026By Blake Daniels

Bump-Out Home Additions in Ankeny: Kitchen and Bath Space

Read More

A bump-out pushes one wall out a few feet to fit an island or a tub. Here is how cantilevered and foundation bump-outs differ, what Ankeny requires and charges, and when a full addition makes more sense.A bump-out pushes one wall out a few feet to fit an island or a tub. Here is how cantilevered and foundation bump-outs differ, what Ankeny requires and charges, and when a full addition makes more sense.A bump-out pushes one wall out a few feet to fit an island or a tub. Here is how cantilevered and foundation bump-outs differ, what Ankeny requires and charges, and…

Nov 9, 2026By Blake Daniels

Tying a Home Addition Into an Older Home in West Des Moines

Read More

A home addition on an older West Des Moines house succeeds or fails at the seam. Here is how footings, floor heights, roof joints, the energy code and alarms come together.A home addition on an older West Des Moines house succeeds or fails at the seam. Here is how footings, floor heights, roof joints, the energy code and alarms come together.A home addition on an older West Des Moines house succeeds or fails at the seam. Here is how footings, floor heights, roof joints, the energy code and alarms come…

Oct 30, 2026By Blake Daniels

Storm Shelter and Safe Room Additions in Central Iowa: Basement, Above-Grade or Both

Read More

A basement is not a safe room. What FEMA P-361 requires, the two ways to build one into a home, and what it costs in a basement finish or an addition.A basement is not a safe room. What FEMA P-361 requires, the two ways to build one into a home, and what it costs in a basement finish or an addition.A basement is not a safe room. What FEMA P-361 requires, the two ways to build one into a home, and what it costs in a basement finish or an…