Deck Building Bondurant, Iowa
Bondurant wants a building permit for decks of every size, including the small, low decks the model code would exempt. City Hall takes the application, inspectors from Veenstra & Kimm check the work, and the zoning code sets how far a deck can reach. Here is how it works.
- Bondurant at a glance
Bondurant facts that shape a deck
Bondurant had 389 residents in 1960 and 7,365 in 2020, with an estimated 9,647 in 2025. Owner-occupied homes make up 91.0 percent of the housing. Deck figures below come from the city code and permit form.
9,647
Residents, July 2025 estimate
389 to 7,365
Residents, 1960 to 2020
91.0%
Owner-occupied housing rate
$318,800
Median owner-occupied value
2021 IRC
Residential code Bondurant enforces
8%
Open deck valuation multiplier
20 feet
Max deck reach into rear yard
42 inches
Minimum foundation depth
Sources: U.S. Census Bureau QuickFacts (2020 Census, July 2025 estimate, ACS 2020 to 2024); State Data Center of Iowa (1960); Bondurant Code, Building and Property Regulations; Bondurant Code, Zoning and Subdivision.
- Permits and rules
Deck permits in Bondurant: what City Hall asks
Yes. Bondurant’s permit guide lists decks among outdoor projects that need a building permit, and its code deletes the model exemption for small detached decks. You apply on the city’s online form with a site plan. These six cards cover the rest.
No small-deck shortcut
The 2021 model code lets a small, low, freestanding deck skip a permit. Bondurant deleted that exemption, item 10 of section R105.2, in its local amendments. The July 2024 permit guide lists decks next to pools, garages and fences as projects that need permits. Only swapping deck boards on an open wood deck is exempt.
Online form and site plan
Bondurant’s online Building Permit form has a Deck and a Covered Deck option and asks for deck square footage. A site plan upload is required for every building permit. The form also asks whether the lot is in a flood plain and whether the project meets the city’s planned unit development and architectural standards.
How the fee is valued
Bondurant multiplies deck square footage by the ICC value for a wood-frame house, then by 8 percent for an open deck. A screened porch uses 15 percent, and a three-season porch 50 percent. The city fee schedule then sets the permit fee. Starting before the permit doubles it, and the form lists a 10 percent Home Base Iowa discount.
Reach into the yards
Open decks without a roof may reach up to 20 feet into the required rear yard. In front, open decks and unenclosed porches may reach up to 6 feet into the front setback. On an R-1 lot the starting lines are a 35-foot rear yard and a 30-foot front yard. Add a roof, and the rear-yard allowance no longer applies.
Footings and stairs
Bondurant’s foundation table sets a 42-inch minimum depth below grade. Its stair amendment lets the top and bottom risers vary up to 1 inch from the rest, but no riser may top 7 3/4 inches. A top landing can be skipped when four or fewer risers serve an outside door that does not swing over the stairs.
Inspections and the permit clock
Call City Hall at 515-967-2418 to schedule inspections. The permit guide asks for 24 hours of notice and says not to cover anything before it passes. Under the city’s amendment, skipping an inspection revokes the permit. The online form says a permit expires one year from issue, or after 180 days without a start.
- Our process
How Busy Builders builds your Bondurant deck
We start by locating the deck against Bondurant’s rear yard line, using the 20-foot encroachment allowance only for an open deck. The online form, site plan and square footage go to City Hall together, so the valuation is right the first time. Footings reach 42 inches, and nothing gets covered until the inspector signs off.
Busy Builders is a registered Iowa contractor, DIAL C140184, completing more than 100 projects a year. Licensed subcontractors we coordinate handle any electrical work, such as deck lighting. Our crews build composite decks with black metal railings and pressure-treated wood decks with long stair runs to grade.
- Rear yard line located before design
- Form, site plan and square footage filed
- No framing covered before inspection
Measured plan to final sign-off

- Achievement
Trusted Deck Builders in Bondurant
Since 2020, Busy Builders has completed more than 1,285 construction and remodeling projects across Central Iowa.









- Frequently Asked Questions
FAQs About Deck Building in Bondurant
What will a deck cost me in Bondurant?
It depends on size, height, stairs, railings and whether you choose composite or treated wood, so we do not publish a range. We measure, check your rear yard line, and send a written estimate. Bondurant’s permit fee is separate: it starts from 8 percent of the ICC wood-frame value per square foot of open deck.
Do small decks need a permit in Bondurant?
Yes. Bondurant’s local code amendments delete the model code’s exemption for small, low, detached decks. The city’s permit guide also lists decks among projects that need a permit. The only deck work on the city’s exemption list is replacing decking boards on an open wood deck.
How far into my backyard setback can a deck go in Bondurant?
Up to 20 feet into the required rear yard, as long as the deck is open and not covered by a roof. R-1 lots carry a 35-foot rear yard. Front decks and unenclosed porches get a smaller allowance, up to 6 feet into the front setback.
Who inspects decks in Bondurant?
Bondurant City Hall uses inspection staff from Veenstra & Kimm. The Building Department page says to call City Hall at 515-967-2418 to schedule, and the permit guide asks for 24 hours of notice. If an inspection is skipped before work is covered, the city’s code revokes the permit.
Does a roofed deck change the rules in Bondurant?
Yes. The rear-yard allowance covers open decks not enclosed or covered by a roof, so a roofed deck has to meet the regular rear setback. The fee changes too: a screened porch is valued at 15 percent of the ICC rate, and a three-season porch at 50 percent.
How long do I have to build after getting a Bondurant permit?
The city’s online permit form says a permit expires one year from issuance. It also expires if work has not started within 180 days or stops for 120 days. Bondurant’s Building Department page gives a shorter 120-day figure, so we confirm the date at City Hall when the permit is issued.
- Newest Blogs
Deck Building Blogs for Bondurant, Iowa

Deck Permits in Waukee, Johnston and Clive: What Each City Requires
Read MoreEvery deck in the western suburbs needs a permit. Here is what Waukee, Johnston and Clive each ask for, how long review takes, and which inspections to expect.Every deck in the western suburbs needs a permit. Here is what Waukee, Johnston and Clive each ask for, how long review takes, and which inspections to expect.Every deck in the western suburbs needs a permit. Here is what Waukee, Johnston and Clive each ask for, how long review takes, and which inspections to expect.

Screened Porch vs Four-Season Porch in Waukee, Johnston and Clive: Cost and Code
Read MoreScreened porch versus four-season porch in Waukee, Johnston and Clive: cost, permits, footing depth and how each one lives through an Iowa winter.Screened porch versus four-season porch in Waukee, Johnston and Clive: cost, permits, footing depth and how each one lives through an Iowa winter.Screened porch versus four-season porch in Waukee, Johnston and Clive: cost, permits, footing depth and how each one lives through an Iowa winter.

Deck Building Cost in Adel, Iowa: 2026 Guide
Read MoreMost Adel decks run $9,000 to $34,000. Cost by material, Iowa frost line footings, and why elevation drives price more than square footage.Most Adel decks run $9,000 to $34,000. Cost by material, Iowa frost line footings, and why elevation drives price more than square footage.Most Adel decks run $9,000 to $34,000. Cost by material, Iowa frost line footings, and why elevation drives price more than square footage.