Bathroom Remodeling
Waukee, IA

Bathroom work in Waukee runs on two trade codes: the 2018 Uniform Plumbing Code and the 2020 National Electrical Code. The city keeps a trades permit application for that work and sets fees from project valuation. Below are the rules, our quoted price bands and why bathroom jobs grow.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

Who lives in Waukee

Waukee’s median household income is $101,029, and 66.5% of homes are owner-occupied. Those figures come from the Census Bureau.

$101,029

Median household income

66.5%

Homes lived in by owners

Valuation

Basis for Waukee permit fees

23,940

Residents in the 2020 Census

2018 UPC

Plumbing code for bathrooms

2020 NEC

Electrical code for bathrooms

2018 IMC

Mechanical code in Waukee

80%

Max refund, no work started

Bathroom remodel permits and codes in Waukee

Waukee sends trade work through its trades permit application, under the 2018 plumbing and 2020 electrical codes. Structural changes, like moving a wall, need a building permit too. Cost and timing depend mostly on scope. Here is how each piece works in Waukee.

Which permits a bathroom needs

Waukee lists a trades permit application on its permits page. If the remodel moves a wall or changes framing, the zoning code’s rule applies: no building may be structurally altered without a permit. We sort out which permits your bathroom needs before demolition starts.

Plumbing under the UPC

Waukee adopted the 2018 Uniform Plumbing Code for plumbing work. Iowa licenses plumbers, and licensed plumbing subcontractors handle every drain, supply line and fixture connection on our jobs. One customer review credits our plumbing sub for a weekend faucet repair after a remodel.

Wiring under the 2020 NEC

Bathroom circuits, lighting and fan wiring in Waukee follow the 2020 National Electrical Code. Licensed electricians we coordinate do that work. The city’s mechanical rules come from the 2018 International Mechanical Code, and fuel gas work follows the 2018 International Fuel Gas Code.

How Waukee sets the fee

Waukee derives permit fees from an annual fee schedule and the project’s valuation. The valuation is the contractor’s total cost or the ICC building valuation figure, and the contractor’s number cannot be lower than the ICC result. Up to 80 percent can be refunded if no work is done.

Price bands we have quoted

Our hall bathroom quotes start around $3,000 to $5,000 for a light refresh, and large primary bathrooms have reached about $60,000. A typical three-quarter or full bath that keeps the layout lands around $15,000 to $20,000. Final costs vary by scope, materials, complexity and location within our service area.

What makes a bathroom grow

Most bathroom jobs grow for one reason: the scope changes after the first estimate. Wiring, plumbing moves, new lighting and finer details get added along the way. We set the estimate up front, so each addition is your decision. Two full bathrooms we finished in 2026 drew reviews, one with new luxury vinyl plank flooring.

How Busy Builders builds your Waukee bathroom remodel

Our Waukee bathrooms start with a walkthrough and a written estimate that names the scope before demolition. We pull the building or trades permits the work needs. Then licensed plumbers and electricians do the rough work under the 2018 plumbing and 2020 electrical codes. Tile, glass and vanity follow once that work is done.

Busy Builders has more than 1,285 completed projects across Central Iowa since 2020. Repeat customers are a pattern in our reviews, and one household hired us back for a full bathroom remodel with a kitchen planned next.

How we remodel baths

Scope first, then the trades

Remodeled walk-in shower with glass enclosure and tiled walls by Busy Builders

Waukee Bathrooms Done Right.

Since 2020, Busy Builders has completed 1,285+ projects across Central Iowa. Every bathroom remodel in Waukee starts with a full walkthrough, a written scope, and a fixed estimate, so you know exactly what you are getting before demo begins.

1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Bathroom Remodeling in Waukee, IA

Our quotes have ranged from about $3,000 to $5,000 for a light hall bath refresh to about $60,000 for a large primary bath. Most three-quarter to full bathrooms that keep their layout come in around $15,000 to $20,000. Final costs vary by scope, materials, complexity and location within our service area.

Plumbing and electrical work goes through Waukee’s trades permit application. If walls or framing change, the zoning code requires a building permit before any structural alteration. Community Development, at 515-978-9533, handles building permits and zoning for the city.

The 2018 Uniform Plumbing Code, adopted in section 155.06 of the city code. Waukee’s amended version also requires building sewers at least 66 inches below grade, which matters more for new homes than bathrooms. Licensed plumbers handle all plumbing on our Waukee jobs.

From valuation. Waukee uses the contractor’s construction cost for the work, or the ICC Building Valuation Data figure if it is higher. Then it applies the city’s annual fee schedule. The city calculates the fee and tells builders the cost when the permit is issued.

Usually because the plan changed. Added wiring, moved plumbing, extra lighting and upgraded details after the first estimate are the most common reasons a bathroom grows. We set the estimate up front so any change is visible and your call.

Yes. Waukee adopted the 2020 National Electrical Code in section 155.07, and the city’s permits page notes that adoption. Bathroom circuits, lighting and fan wiring go in to that code, installed by licensed electricians we coordinate.

Posted on Google Google
8 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Our overall experience with Busy Builders LLC and its owner/general contractor, Blake, was disappointing, particularly regarding project management, communication, materials, and follow-through. First, I want to acknowledge that the subcontractors did a great job. Our issues were not with the quality of their work, but with the lack of oversight, planning, and coordination from the general contractor. Blake was largely absent throughout the project, providing very little direction or coordination. Planning was disorganized, materials were not ordered in a timely manner, and communication was consistently lacking. One of our biggest frustrations was the handling of materials and finishes. We had specific selections and expectations for our renovation, but as the project progressed, we found ourselves having to make substitutions and compromises because of scheduling constraints and poor planning. Rather than being informed early enough about potential material availability issues or necessary changes, we were often presented with these situations when there was little time left to explore alternatives. This left us feeling pressured to make decisions based on keeping the project moving rather than choosing what we actually wanted. One particularly frustrating example involved the doors. We were told that because Blake couldn’t find the exact same doors, matching the existing woodwork using a different type of wood would be impossible. I later purchased a custom-made wooden dog gate, stained it myself, and managed to match the existing trim perfectly. This experience contradicted what we had been told about the impossibility of matching the existing woodwork and added to our frustration with how material alternatives were presented to us. We were more than willing to pay additional costs for better materials or appropriate replacements had those options been presented to us with sufficient notice. Instead, we felt our choices were limited by circumstances that could have been avoided with better communication and project management. The finished project looks fine on the surface, but it is not the project we asked for or were promised. Based on our experience, we would not hire Busy Builders LLC or Blake again. P.S. I happily wrote a separate positive review for the electrical contractors. They did excellent work and deserved the recognition. My dissatisfaction with this project is directed at the general contractor and how the renovation was managed, not the tradespeople who did the actual work.
Posted on Google Google
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Could not be more satisfied. Competitive pricing, flexible optionality, and amazing responsiveness. We are elated with the work Blake and his team did to finish our basement!
Posted on Google Google
50 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience, they did a great job on our basement. We had nasty foundation and out of code wiring. Blake got it all taken care of and up to code! This experience was awesome!!
Posted on Google Google
54 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
True craftsmanship thru out. No rush job done right from the start. Easy to work with and answered all questions. They did two decks for our duplex. One was Trex and is beautiful and the rental is all pressure treated lumber. Well done Busy Builders and they back their work 100 percent.
Posted on Google Google
92 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Quality work, fair pricing, followed through on what we discussed without delay, and personable guys to deal with. Will be using them again.
Posted on Google Google
123 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Blake and his guys were top notch all the way. I would highly recommend them. They did a wonderful job on our bathroom and our new luxury vinyl floors. We will definitely use them again in the future.
Posted on Google Google
158 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
+4
Beautiful job. Josh and Isaiah paid attention to what we wanted and asked lots of questions. Stairs are wonderful!
Posted on Google Google
174 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have used Busy Builders before, and recently hired them again for a full bathroom remodeling project. They are perfectionists and got the job done timely. We love our new bathroom, and plan on hiring them again to remodel our kitchen in 2027.
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

Bathroom Remodeling Resources for Waukee Homeowners

Nov 11, 2026By Blake Daniels

Bathroom Remodel Exhaust Fans and Iowa Winter Condensation

Read More

Winter exposes bad bathroom fans when warm, wet air meets cold ducts and attics. Here is what code requires and how to size, duct and control the fan in a bathroom remodel.Winter exposes bad bathroom fans when warm, wet air meets cold ducts and attics. Here is what code requires and how to size, duct and control the fan in a bathroom remodel.Winter exposes bad bathroom fans when warm, wet air meets cold ducts and attics. Here is what code requires and how to size, duct and control the fan in a…

Oct 21, 2026By Blake Daniels

Primary Bath vs Hall Bath in Clive: Where the Money Goes

Read More

Same trades, same tile brand, $40,000 apart. Where the money goes in a Clive hall bath versus a primary bath, using ranges we have actually quoted.Same trades, same tile brand, $40,000 apart. Where the money goes in a Clive hall bath versus a primary bath, using ranges we have actually quoted.Same trades, same tile brand, $40,000 apart. Where the money goes in a Clive hall bath versus a primary bath, using ranges we have actually quoted.

Oct 14, 2026By Blake Daniels

Bathroom Remodel Timelines in Urbandale: Why a Two-Week Estimate Becomes Four

Read More

Two to three weeks on site inside a five to eight week window. Here is what stretches an Urbandale bathroom remodel and how to keep the schedule honest.Two to three weeks on site inside a five to eight week window. Here is what stretches an Urbandale bathroom remodel and how to keep the schedule honest.Two to three weeks on site inside a five to eight week window. Here is what stretches an Urbandale bathroom remodel and how to keep the schedule honest.