Home Building
Nevada, IA

A new house in Nevada, the Story County seat, comes with a square-foot permit fee and two utility connection fees. It also needs a certificate of occupancy before move-in. The city takes applications through Cloudpermit and inspects with its own staff. Here is what Nevada charges and checks.

2020
Serving Central Iowa Since​
1285+
Completed Projects​

Nevada, Iowa in figures

Nevada has grown slowly and steadily, from 4,227 residents in 1960 to 6,925 in the 2020 Census. More than seven in ten homes are owner-occupied, and the median value is $182,400. Figures come from the Census Bureau, the state data center and Story County.

6,974

July 2025 Census estimate

4,227 to 6,925

Residents, 1960 to 2020

71.9%

Owner-occupied housing rate

1853

Chosen as Story County seat

$75 + $0.25/sq ft

Residential building permit fee

Half

Plan review, share of permit

$200 each

Water and sewer connection

10,000 sq ft

Minimum R-1 lot size

Sources: U.S. Census Bureau QuickFacts (2020 Census, July 2025 estimate, ACS 2020 to 2024); State Data Center of Iowa (1960); Story County history; Nevada fee appendix; Nevada Code 165.09.

New home rules in Nevada, step by step

Nevada requires a building permit for every new house, priced by the square foot, with plan review paid up front. The city adopts the state building code and issues a certificate of occupancy at the end. These six cards cover each step in between.

Applying through Cloudpermit

Nevada processes building permits through Cloudpermit, an online portal. Staff review each application for code compliance before it is approved. Questions go to the Building and Zoning Official at City Hall, 1209 6th Street, or 515-382-5466. The current official joined the city in April 2026 and handles both zoning and building.

Which code applies

City code section 156.04 adopts the Iowa State Building Code by reference, including the one- and two-family dwelling code. Nevada does not print an edition year on its own pages, so we confirm the edition in force with the city. Public improvements, such as work tied into city streets and utilities, follow the statewide SUDAS design manuals under section 155.03.

Fees by the square foot

A new house pays $75 plus $0.25 per square foot for the building permit. Plan review costs one-half of the building permit fee and is due when plans are submitted. Plumbing runs $35 plus $2 per fixture unit, electrical $35 plus $2 per circuit, and mechanical $35 plus $2 per gas outlet.

Water and sewer hookups

Each new home pays a $200 water connection fee and a $200 sewer connection fee. Tap fees are separate and scale with pipe size, starting at $150 for the smallest. Properties outside city limits pay $600 more. Driveway or utility work in the street needs a $50 right-of-way license and a $20 excavation permit.

Lot size and zoning

R-1 lots need at least 10,000 square feet for a single-family home, and buildings may cover no more than 35 percent of the lot. R-2 lots need 8,000 square feet and allow 45 percent coverage. Houses may stand up to 38 feet tall. The city posted a new zoning map in June 2026 that shows each lot’s district.

Inspections and move-in

Nevada inspects new homes with its own staff. Each inspection must be requested 24 hours ahead and is handled first come, first served. Under section 103.15, sump pump water may not drain into the sanitary sewer. Section 156.32 says no one may occupy the house until the building official issues a certificate of occupancy.

How Busy Builders builds your Nevada new home

We start by confirming your lot’s zoning district and coverage limit, then size the house plan to fit it. Plan review is due when plans go in through Cloudpermit, so we budget that fee from day one, along with both $200 connection fees. Our licensed subcontractors pull the plumbing, electrical and mechanical permits at the city’s per-fixture, per-circuit and per-outlet rates. We request each inspection a day ahead and close out with the certificate of occupancy.

Busy Builders is a registered Iowa contractor, DIAL C140184, and completes more than 100 projects a year across Central Iowa.

Building in Nevada

Our path to occupancy

New home under construction with house wrap and windows installed on a Central Iowa lot, a Busy Builders home building project

Trusted Home Building Contractors in Nevada, IA

Since 2020, Busy Builders has completed more than 1,285 projects across Central Iowa. That track record reflects the transparency and honesty we bring to every project, from the first consultation through the final walkthrough.
1285+
Completed Projects​
90+
Crew and Trade Partners​
2020
Serving Central Iowa Since​

FAQs About Home Building in Nevada, IA

Our new homes start at about $150 per square foot. Final costs vary by scope, materials, complexity and location within our service area. On top of construction, Nevada charges $75 plus $0.25 per square foot for the permit and half that again for plan review. Water and sewer connections add $200 each.

Nevada adopts the Iowa State Building Code by reference in section 156.04 of its city code, including the one- and two-family dwelling code. Because it adopts by reference without naming an edition, we confirm the edition in force with the Building and Zoning Official before plans go in.

In the R-1 district, at least 10,000 square feet for a single-family home. R-2 lots need 8,000 square feet, and R-3 lots need 6,000. Coverage limits rise from 35 percent in R-1 to 45 percent in R-2. Yard setbacks vary by district, so we confirm them with the city for your specific lot.

Only after the building official issues a certificate of occupancy. Section 156.32 of the city code bars anyone from using or occupying a building that needs one until it is issued. Final inspections are requested at least 24 hours ahead and scheduled first come, first served.

In July 2025 the city featured Oak Park Estates, off Highway 30 on Sixth Street. It sits on land that once held Oak Park Academy. Its first phase has 20 townhome lots and 10 single-family lots. The feature also notes direct access to the city’s bike and walking trail system. The June 2026 zoning map shows the district for any lot.

The city does, through its Planning and Zoning Department. Building and Zoning Official Mike Sauer handles permits and inspections from City Hall at 1209 6th Street. Call 515-382-5466 at least 24 hours before you need an inspection. Requests are handled in the order they come in.

Home Building Resources for Nevada and Central Iowa

Oct 7, 2026By Blake Daniels

Building on a Rural Lot in Dallas or Madison County: Septic, Well and County Permits

Read More

County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.County permits instead of city, a septic system and a well instead of utilities. What a rural lot in Dallas or Madison County really costs to build on.

Sep 28, 2026By Blake Daniels

Pouring Foundations Before the Freeze: A Fall Home Build Start in Story County

Read More

How late can you pour a foundation in Story County? The 42-inch frost line, cold-weather concrete costs and what a fall home build start buys you.How late can you pour a foundation in Story County? The 42-inch frost line, cold-weather concrete costs and what a fall home build start buys you.How late can you pour a foundation in Story County? The 42-inch frost line, cold-weather concrete costs and what a fall home build start buys you.

Sep 24, 2026By Blake Daniels

What a General Contractor Actually Does on Your Central Iowa Project

Read More

What a general contractor does day to day on a Central Iowa home build or addition, what you pay for, and where owner-run projects go wrong.What a general contractor does day to day on a Central Iowa home build or addition, what you pay for, and where owner-run projects go wrong.What a general contractor does day to day on a Central Iowa home build or addition, what you pay for, and where owner-run projects go wrong.